Home | Search | Help | Advertising | Contact Us | Add to Favorites

 



Most viewed/Fernald Silo 3 Project - Shipping Preparations _ Nuclear Pictures
.



Register Login Google for More Images. Flickr for More Images. DeviantART for More Images.
Album list Last uploads Last comments Most viewed Top rated My Favorites Search

Home > Nuclear Facilities > North America > USA > Region III (Mid West) > Fernald (FEMP)


Fernald Silo 3 Project - Shipping Preparations


  Workers will remove 5,100 cubic yards of low-level cold metal oxide waste from Silo 3. Waste from the production process was placed in the silo between 1952 and 1957. Workers will use pneumatic and mechanical retrieval systems to remove the waste from the silo and package it in soft-sided containers for off site shipment. The waste will be treated only as required to meet commercially permitted facility's waste acceptance criteria.  

2010146.jpg
2012706.jpg
fernald_silo_6.jpg
2010148.jpg
RSS for Messages RSS for Pictures RSS for Pictures
 

This web page was last updated on April 15th, 2006 By Michael D. Rennhack.
NukeWorker™ is a registered trademark of NukeWorker.com,
a not-for-profit Company ©1996-2006 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it.  Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem? | Syndicate our content

Search NukeWorker.com