| Search results - "Demolition" |
| |
|
|
| |
|
|
| |
Brokk used for demolition of the wall of the bio-shield
|
|
|
| |
|
|
| |
Aerial photo of Yankee Rowe during D&D
|
|
|
| |
|
|
| |
Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).
|
|
|
| |
|
|
| |
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.
|
|
|
| |
|
|
| |
Operating Engineers use Shears to Cut Away Sections of Plant 8.
|
|
|
| |
|
|
| |
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.
|
|
|
| |
|
|
| |
The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.
|
|
|
| |
|
|
| |
Plants 2, 3 and 8 After Demolition.
|
|
|
| |
|
|
| |
The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.
|
|
|
| |
|
|
| |
Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.
|
|
|
| |
|
|
| |
Early Demolition Stages of Plants 2, 3 and 8.
|
|
|
| |
|
|
| |
Operating Engineers use Grapplers and Bulldozers to Place and Compact Demolition Debris in Cell 4 of the On-Site Disposal Facility (OSDF).
|
|
|
| |
|
|
| |
Fernald's K-65 Silos are Gone.
|
|
|
| |
|
|
| |
The Decontamination and Demolition Project Work Scope Includes the Dismantlement of 259 Former Production Plants, Support Structures and Associated Components.
|
|
|
| |
|
|
| |
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).
|
|
|
| |
|
|
| |
A Teamster Places Impacted Material Around Demolition Debris in Cell 4 of the On-Site Disposal Facility.
|
|
|
| |
|
|
| |
Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.
|
|
|
| |
|
|
| |
Workers Topple the Bulk Lime Handling Building.
|
|
|
| |
|
|
| |
Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.
|
|
|
|
|
| |
|
|
| |
Decontamination & Demolition
|
|
|
| |
|
|
| |
Operating Engineers Raze the Last Section of the Pilot Plant. The Facility was the Last of 10 Plants to be Removed from the Fernald Skyline.
|
|
|
| |
|
|
| |
Maine Yankee Demolition Video
|
|
|
| |
|
|