| Search results - "Facility" |
| |
|
|
|
|
| |
|
|
| |
Painesville FUSRAP Site Map
|
|
|
|
|
|
| |
|
|
| |
Princeton Plasma Physic Laboratory Site Map
|
|
|
| |
|
|
| |
Princeton Plasma Physic Laboratory Site Map
|
|
|
| |
|
|
| |
The NASA Plum Brook Reactor Facility (PBRF) in the late 1960’s.
|
|
|
| |
|
|
| |
The Space Power Facility at the Plum Brook Station in Sandusky, Ohio
|
|
|
| |
|
|
| |
Wright-Patterson Air Force Base Bldg. 470
|
|
|
| |
|
|
| |
Wright-Patterson Air Force Base Bldg. 470
|
|
|
| |
|
|
| |
Wright-Patterson Air Force Base Bldg. 470
|
|
|
| |
|
|
| |
Comanche Peak Training facility
|
|
|
| |
|
|
| |
Aerial photo of Yankee Rowe during D&D
|
|
|
|
|
|
|
| |
|
|
| |
CONSTRUCTION PROGRESS OF EXPLORATORY STUDIES FACILITY STARTER TUNNEL.
|
|
|
| |
|
|
| |
GEOLOGIST TAKING FRACTURE MEASUREMENTS AT EXPLORATORY STUDIES FACILITY, NORTH FACE.
|
|
|
| |
|
|
| |
The Belfield facility site is located about one mile southeast of the town of Belfield in Stark County, North Dakota.
|
|
|
| |
|
|
| |
The Bowman facility site is located about seven miles west of the town of Bowman in Bowman County, North Dakota.
|
|
|
|
|
|
|
| |
|
|
| |
Nuclear Jet Airplane Initial Engine-Test Facility
|
|
|
| |
|
|
| |
The B Plant Reprocessing Canyon
|
|
|
| |
|
|
| |
DuPont Administration Building, Savannah River Plant
|
|
|
| |
|
|
| |
Fernald Feed Materials Production Center
|
|
|
| |
|
|
| |
Angus Anson Generating Station is a two-unit peaking facility, capable of firing on natural gas or oil.
|
|
|
| |
|
|
| |
Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.
|
|
|
| |
|
|
| |
Workers are Trained how to Operate the Silo 3 Excavator.
|
|
|
| |
|
|
| |
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.
|
|
|
| |
|
|
| |
Silo 3 Treatment Facility
|
|
|
| |
|
|
| |
Fernald Silo 3 Project - Shipping Preparations
|
|
|
| |
|
|
| |
Fernald Silo 3 Project - Shipping Preparations
|
|
|
| |
|
|
| |
Fernald Silo 3 Project - Waste Packaging
|
|
|
| |
|
|
| |
Fernald Silo 3 Project - Shipping Container
|
|
|
| |
|
|
| |
Fernald Silo 3 Project - Waste Retrieval
|
|
|
|
|
|
|
|
| |
|
|
| |
Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).
|
|
|
| |
|
|
| |
An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.
|
|
|
| |
|
|
| |
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.
|
|
|
| |
|
|
| |
Operating Engineers use Shears to Cut Away Sections of Plant 8.
|
|
|
| |
|
|
| |
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.
|
|
|
| |
|
|
| |
The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.
|
|
|
| |
|
|
| |
Plants 2, 3 and 8 After Demolition.
|
|
|
| |
|
|
| |
The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.
|
|
|
| |
|
|
| |
Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.
|
|
|
| |
|
|
| |
Early Demolition Stages of Plants 2, 3 and 8.
|
|
|
| |
|
|
| |
Operating Engineers use Grapplers and Bulldozers to Place and Compact Demolition Debris in Cell 4 of the On-Site Disposal Facility (OSDF).
|
|
|
| |
|
|
| |
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).
|
|
|
| |
|
|
| |
An Iron Worker Installs Rebar at Valve House 7.
|
|
|
| |
|
|
| |
An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.
|
|
|
| |
|
|
| |
A Teamster Places Impacted Material Around Demolition Debris in Cell 4 of the On-Site Disposal Facility.
|
|
|
| |
|
|
| |
Workers Expose the Cell 6 Liner to Prepare the Surface for Attachment to the Cell 7 Liner.
|
|
|
| |
|
|
| |
Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.
|
|
|
| |
|
|
| |
A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.
|
|
|
| |
|
|
| |
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.
|
|
|
| |
|
|
| |
Workers Topple the Bulk Lime Handling Building.
|
|
|
| |
|
|
| |
Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.
|
|
|
| |
|
|
| |
Fernald Silo 3 Project - Waste Packaging Station
|
|
|
|
|
|
|
|
|
| |
|
|
| |
Liquid Effluent Retention Facility
|
|
|
| |
|
|
| |
The 200 Areas Treated Effluent Disposal Facility treats and stores radioactive waste.
|
|
|
| |
|
|
| |
Watts Bar Nuclear Power Plant
|
|
|
| |
|
|
| |
Trojan Nuclear Power Plant, Rainier Ore
|
|
|
| |
|
|
| |
Three Mile Island nuclear power plant
|
|
|
| |
|
|
| |
San Onofre Nuclear Generating Station
|
|
|
| |
|
|
| |
San Onofre Nuclear Generating Station
|
|
|
| |
|
|
| |
Rocky Flats Nuclear Bomb Facility (closed)
|
|
|
| |
|
|
| |
Y-12 nuclear weapons plant
|
|
|
| |
|
|
| |
Y-12 nuclear weapons plant in Oak Ridge, Tenn
|
|
|
| |
|
|