| Search results - "Ore" |

More Washington Apples??
|
|

Ancient Teletector
|
|

Preparing for abatement
|
|

Christy Harper and Melissa Cogdill
|
|

Blanik trying to Catch Me in the thermal.
|
|

Rolling North headed out on my cross-country flight.
|
|

Ahhhh 26 years old and invincible!
|
|

Running Club Lockheed's wing...
|
|

Waiting around for a glider....
|
|

Tucking mom into bed.
|
|
|

Corey and Becki Stokes
|
|

wildman
|
|

HAIRDUDES finally in print!
|
|

Big Rock Point Exterior
|
|

Big Rock Control Room
|
|

Examining a Fuel Bundle
|
|

Big Rock Point from Air
|
|

Core Pic
|
|

ETI OREX
|
|

Commodore
|
|
|

core shroud
|
|

RE23
|
|

September 2006
|
|

FBR
|
|

FBR
|
|

Aerial photo of Yankee Rowe during D&D
|
|

The Yankee Rowe nuclear plant prior to decommissioning.
|
|

BWR Diagram
|
|

Decommissioning of Connecticut Yankee
|
|

Vogtle Control Room
|
|

Vogtle Fuel Pool
|
|

Sellafield
|
|

Trawsfynydd
|
|

Trawsfynydd
|
|

Trawsfynydd
|
|

Windscale
|
|

Windscale
|
|
|

Windscale
|
|

Windscale
|
|

Victoreen 715
|
|

Victoreen 710 Geiger Counter
|
|

SAPS Core 2 model
|
|

OREX
|
|

Salt Lake City Site - Fire Station Before Excavation to Remove Mill Tailings - Exterior View
|
|

Durango Disposal Site Before Remedial Action
|
|

The Lakeview mill site is located about one mile northwest of the City of Lakeview in Lake County, Oregon, and immediately west of U.S. 395. It is in a broad valley north of Goose Lake.
|
|

The site of the former Riverton uranium-vanadium ore processing mill is located about one mile southwest of the city of Riverton, Fremont County, Wyoming.
|
|

The former Mexican Hat uranium mill site is located on Navajo Nation land 1.5 miles southwest of Mexican Hat, San Juan County, Utah. The site is northeast of the town of Halchita, Utah, which began as the housing area for the mill's employees.
|
|

The Maybell uranium mill site is located 5 miles northeast of the town of Maybell in Moffat County, Colorado.
|
|

The Lowman mill site is in north-central Boise County, Idaho, about 73 miles northeast of the City of Boise. It is in the Boise National Forest one-half mile northeast of the village of Lowman (on State Road 21).
|
|

The Lakeview mill site is located about one mile northwest of the City of Lakeview in Lake County, Oregon, and immediately west of U.S. 395. It is in a broad valley north of Goose Lake.
|
|

The Gunnison uranium mill site is located just southwest of the City of Gunnison in Gunnison County, Colorado.
|
|

The Green River concentrator site is located in Grand County, Utah, and about one-half mile east of the Green River, one mile southeast of the City of Green River, Emery County, Utah
|
|

The Belfield facility site is located about one mile southeast of the town of Belfield in Stark County, North Dakota.
|
|

The Bowman facility site is located about seven miles west of the town of Bowman in Bowman County, North Dakota.
|
|

Mound
|
|

Rocky Flats
|
|

Sampling the Derby
|
|

Back to Fernald
|
|

Laundry
|
|

SPECTROMETER IN END STATION AT THE STANFORD LINEAR ACCELERATOR.
|
|

Marble Hill Nuclear Power Plant
|
|

OREX
|
|

Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.
|
|

Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.
|
|

Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).
|
|

An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.
|
|

Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.
|
|

Operating Engineers use Shears to Cut Away Sections of Plant 8.
|
|

Workers Install Insulation on Piping in the TTA Building.
|
|

Electricians Install Various Sizes of Conduit in the Electrical Room.
|
|

The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.
|
|

Plants 2, 3 and 8 After Demolition.
|
|

The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.
|
|

Early Demolition Stages of Plants 2, 3 and 8.
|
|

Operating Engineers use Grapplers and Bulldozers to Place and Compact Demolition Debris in Cell 4 of the On-Site Disposal Facility (OSDF).
|
|

Two Crews Work to Remove Waste Material from Pit 2.
|
|
|
|