| Search results - "Red" |

Redneck Seafood
|
|

Hail compared to a large egg
|
|

Hail compared to a large egg
|
|

Surry's Stubborn Snubbers
|
|

Asbestos Abatement 100N 109N basement
|
|

Redneck swing
|
|

Waiting around for a glider....
|
|

Mary's Ms. Red - at the Turn A Round
|
|

Huntsman Cancer Institute From 5th floor Charlie Brown's Window on Parking Lot
|
|
![Filename=Dave_and_his_Edsel_parked_next_to_Ms[1][1]__Red_at_Huntsman_Cancer_Institute_new.jpg
Filesize=543KB
Dimensions=1280x960
Date added=Dec 21, 2007 Dave_and_his_Edsel_parked_next_to_Ms[1][1]__Red_at_Huntsman_Cancer_Institute_new.jpg](albums/userpics/12467/thumb_Dave_and_his_Edsel_parked_next_to_Ms%5B1%5D%5B1%5D__Red_at_Huntsman_Cancer_Institute_new.jpg)
Dave's Edsel next to Ms. red 1959 Corsair Edsel Salt Lake Cilty Huntsman Cancer Institiute
|
|

Wright-Patterson Air Force Base Bldg. 470
|
|

Wright-Patterson Air Force Base Bldg. 470
|
|

Wright-Patterson Air Force Base Bldg. 470
|
|
|

September 2006
|
|
|

Aerial photo of Yankee Rowe during D&D
|
|

AP1000
|
|

AP1000 Design
|
|

Decommissioning of Connecticut Yankee
|
|

Connecticut Yankee as it appeared in June 2002
|
|

Trawsfynydd
|
|

Trawsfynydd
|
|

Trawsfynydd
|
|

Windscale
|
|

Windscale
|
|
|

Windscale
|
|

Windscale Map
|
|

Windscale
|
|

Windscale
|
|

Windscale Map
|
|

Transfer Cask into SFP
|
|

TFR & TSC in the FTE
|
|

Transfer of the TSC from the TFR to the VCC
|
|

Shredding Systems Inc
|
|

Visionary Solutions
|
|

The Maybell uranium mill site is located 5 miles northeast of the town of Maybell in Moffat County, Colorado.
|
|

The Lowman mill site is in north-central Boise County, Idaho, about 73 miles northeast of the City of Boise. It is in the Boise National Forest one-half mile northeast of the village of Lowman (on State Road 21).
|
|

The Lakeview mill site is located about one mile northwest of the City of Lakeview in Lake County, Oregon, and immediately west of U.S. 395. It is in a broad valley north of Goose Lake.
|
|

The Gunnison uranium mill site is located just southwest of the City of Gunnison in Gunnison County, Colorado.
|
|

The Green River concentrator site is located in Grand County, Utah, and about one-half mile east of the Green River, one mile southeast of the City of Green River, Emery County, Utah
|
|

The Belfield facility site is located about one mile southeast of the town of Belfield in Stark County, North Dakota.
|
|

The Bowman facility site is located about seven miles west of the town of Bowman in Bowman County, North Dakota.
|
|

Nuclear-Powered Jet Airplane Engines (1957-1961)
|
|

Nuclear Jet Airplane Initial Engine-Test Facility
|
|

Hanford n-Reactor
|
|

The B Plant Reprocessing Canyon
|
|

DuPont Administration Building, Savannah River Plant
|
|

Ingots of Fernald at Ashtabula
|
|

Ashtabula Uranium Metal Extrusion Press
|
|

Pickled Extrusion Inspection
|
|

Cooling the Derby
|
|

Ingots of Fernald at Ashtabula
|
|
![Filename=AngusAnson[1].jpg
Filesize=29KB
Dimensions=150x142
Date added=Dec 19, 2005 AngusAnson[1].jpg](albums/userpics/12116/thumb_AngusAnson%5B1%5D.jpg)
Angus Anson Generating Station is a two-unit peaking facility, capable of firing on natural gas or oil.
|
|

Pathfinder Nuclear Generating Station
|
|

I'm tired of waiting, feed me already.
|
|

A "Brown cloud" usually signifies a shattered blade
|
|

The entangled "spaghetti" mess of retrieval after a shattered blade
|
|

Workers are Trained how to Operate the Silo 3 Excavator.
|
|

Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.
|
|

Silo 3 Treatment Facility
|
|

Fernald Silo 3 Project - Shipping Preparations
|
|

Fernald Silo 3 Project - Shipping Preparations
|
|

Fernald Silo 3 Project - Waste Packaging
|
|

Fernald Silo 3 Project - Shipping Container
|
|

Fernald Silo 3 Project - Waste Retrieval
|
|
|

Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).
|
|

An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.
|
|

Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.
|
|

Operating Engineers use Shears to Cut Away Sections of Plant 8.
|
|

Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.
|
|

The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.
|
|

Plants 2, 3 and 8 After Demolition.
|
|

The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.
|
|

Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.
|
|

Early Demolition Stages of Plants 2, 3 and 8.
|
|

A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).
|
|

Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.
|
|
|
|