| Most viewed - Fernald (FEMP) |
| |
|
|
| |
|
|
| |
Operating Engineers Raze the Last Section of the Pilot Plant. The Facility was the Last of 10 Plants to be Removed from the Fernald Skyline.300 views
|
|
|
| |
|
|
| |
Uranium Green Salt244 views
|
|
|
| |
|
|
| |
Cooling the Derby244 views
|
|
|
| |
|
|
| |
Sampling the Derby243 views
|
|
|
|
|
| |
|
|
| |
Decontamination & Demolition234 views
|
|
|
|
|
|
|
| |
|
|
| |
Fernald Feed Materials Production Center223 views
|
|
|
| |
|
|
| |
Ingots of Fernald at Ashtabula222 views
|
|
|
|
| |
|
|
| |
Waste Pits Project220 views
|
|
|
| |
|
|
| |
Ecological Restoration215 views
|
|
|
| |
|
|
| |
Silos 1 and 2 Project211 views
|
|
|
|
|
|
| |
|
|
| |
Fernald Silo 3 Project - Waste Retrieval203 views
|
|
|
|
|
|
| |
|
|
| |
Water Treatment Bypass Process196 views
|
|
|
|
|
|
|
|
|
|
| |
|
|
| |
Fernald Environmental Project (FEMP)182 views
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
| |
Electricians Install Various Sizes of Conduit in the Electrical Room.169 views
|
|
|
|
| |
|
|
| |
Fernald Environmental Project (FEMP)168 views
|
|
|
| |
|
|
| |
Fernald Silo 3 Project - Waste Packaging168 views
|
|
|
|
| |
|
|
| |
Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.167 views
|
|
|
|
|
|
|
| |
|
|
| |
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.165 views
|
|
|
| |
|
|
| |
Workers Install Insulation on Piping in the TTA Building.163 views
|
|
|
| |
|
|
| |
Workers are Trained how to Operate the Silo 3 Excavator.163 views
|
|
|
| |
|
|
| |
Workers Topple the Bulk Lime Handling Building.162 views
|
|
|
|
|
|
|
| |
|
|
| |
Operating Engineers use Shears to Cut Away Sections of Plant 8.157 views
|
|
|
| |
|
|
| |
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.156 views
|
|
|
|
|
|
|
|
| |
|
|
| |
Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).150 views
|
|
|
|
| |
|
|
| |
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.149 views
|
|
|
|
|
|
| |
|
|
| |
Fernald Silo 3 Project - Shipping Preparations147 views
|
|
|
| |
|
|
| |
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.145 views
|
|
|
| |
|
|
| |
Fernald Silo 3 Project - Shipping Preparations145 views
|
|
|
| |
|
|
| |
Silo 3 Treatment Facility145 views
|
|
|
|
|
| |
|
|
| |
Fernald Environmental Project (FEMP)142 views
|
|
|
| |
|
|
| |
A Supervisor Gives Instructions to an Operating Engineer in Pit 3.142 views
|
|
|
| |
|
|
| |
Fernald Silo 3 Project - Shipping Container142 views
|
|
|
|
|
| |
|
|
| |
Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.138 views
|
|
|
|
| |
|
|
| |
An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.137 views
|
|
|
| |
|
|
| |
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).137 views
|
|
|
| |
|
|