Last viewed - North America
|
Uranium Hexafluoride (UF6)2207 viewsMar 31, 2024 at 10:24 PM
|
|
40hr Hazwopr Walk3118 viewsMar 31, 2024 at 10:23 PM
|
|
NukeWorker Night at Outback2350 viewsMar 31, 2024 at 10:23 PM
|
|
Sandia National Lab701 viewsMar 31, 2024 at 10:38 AM
|
|
207 viewsMar 31, 2024 at 03:09 AM
|
|
The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.335 viewsMar 31, 2024 at 02:57 AM
|
|
369 viewsMar 30, 2024 at 04:43 PM
|
|
Brunswick Nuclear Power Plant2651 viewsMar 30, 2024 at 12:12 PM
|
|
423 viewsMar 30, 2024 at 10:35 AM
|
|
469 viewsMar 30, 2024 at 10:35 AM
|
|
498 viewsMar 30, 2024 at 10:35 AM
|
|
333 viewsMar 30, 2024 at 10:34 AM
|
|
379 viewsMar 30, 2024 at 10:33 AM
|
|
339 viewsMar 30, 2024 at 10:33 AM
|
|
368 viewsMar 30, 2024 at 10:33 AM
|
|
333 viewsMar 30, 2024 at 10:33 AM
|
|
349 viewsMar 30, 2024 at 10:33 AM
|
|
332 viewsMar 30, 2024 at 10:32 AM
|
|
322 viewsMar 30, 2024 at 10:32 AM
|
|
330 viewsMar 30, 2024 at 10:32 AM
|
|
296 viewsMar 30, 2024 at 10:32 AM
|
|
284 viewsMar 30, 2024 at 10:32 AM
|
|
307 viewsMar 30, 2024 at 10:32 AM
|
|
300 viewsMar 30, 2024 at 10:32 AM
|
|
301 viewsMar 30, 2024 at 10:32 AM
|
|
410 viewsMar 30, 2024 at 10:32 AM
|
|
329 viewsMar 30, 2024 at 10:32 AM
|
|
340 viewsMar 30, 2024 at 10:32 AM
|
|
338 viewsMar 30, 2024 at 10:32 AM
|
|
Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.388 viewsMar 30, 2024 at 10:31 AM
|
|
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.418 viewsMar 30, 2024 at 10:30 AM
|
|
Silo 3 Treatment Facility377 viewsMar 30, 2024 at 10:30 AM
|
|
Fernald Silo 3 Project - Shipping Preparations406 viewsMar 30, 2024 at 10:30 AM
|
|
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.431 viewsMar 30, 2024 at 10:27 AM
|
|
Fernald Silo 3 Project - Waste Packaging504 viewsMar 30, 2024 at 10:26 AM
|
|
474 viewsMar 30, 2024 at 10:25 AM
|
|
Fernald Silo 3 Project - Shipping Container383 viewsMar 30, 2024 at 10:24 AM
|
|
Fernald Silo 3 Project - Waste Retrieval490 viewsMar 30, 2024 at 10:23 AM
|
|
376 viewsMar 30, 2024 at 10:23 AM
|
|
396 viewsMar 30, 2024 at 10:22 AM
|
|
350 viewsMar 30, 2024 at 10:21 AM
|
|
Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).391 viewsMar 30, 2024 at 10:21 AM
|
|
An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.338 viewsMar 30, 2024 at 10:21 AM
|
|
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.380 viewsMar 30, 2024 at 10:20 AM
|
|
Operating Engineers use Shears to Cut Away Sections of Plant 8.413 viewsMar 30, 2024 at 10:19 AM
|
|
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.440 viewsMar 30, 2024 at 10:16 AM
|
|
Workers Install Insulation on Piping in the TTA Building.426 viewsMar 30, 2024 at 10:16 AM
|
|
Electricians Install Various Sizes of Conduit in the Electrical Room.470 viewsMar 30, 2024 at 10:16 AM
|
|
The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.346 viewsMar 30, 2024 at 10:16 AM
|
|
Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.915 viewsMar 30, 2024 at 10:05 AM
|
|
Early Demolition Stages of Plants 2, 3 and 8.461 viewsMar 30, 2024 at 10:03 AM
|
|
Operating Engineers use Grapplers and Bulldozers to Place and Compact Demolition Debris in Cell 4 of the On-Site Disposal Facility (OSDF).404 viewsMar 30, 2024 at 10:03 AM
|
|
Two Crews Work to Remove Waste Material from Pit 2.342 viewsMar 30, 2024 at 10:03 AM
|
|
A Supervisor Gives Instructions to an Operating Engineer in Pit 3.383 viewsMar 30, 2024 at 10:03 AM
|
|
Fernald's K-65 Silos are Gone.412 viewsMar 30, 2024 at 10:02 AM
|
|
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).415 viewsMar 30, 2024 at 10:01 AM
|
|
An Iron Worker Installs Rebar at Valve House 7.503 viewsMar 30, 2024 at 10:01 AM
|
|
An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.352 viewsMar 30, 2024 at 10:01 AM
|
|
A Teamster Places Impacted Material Around Demolition Debris in Cell 4 of the On-Site Disposal Facility.352 viewsMar 30, 2024 at 10:00 AM
|
|
Workers Expose the Cell 6 Liner to Prepare the Surface for Attachment to the Cell 7 Liner.360 viewsMar 30, 2024 at 10:00 AM
|
|
Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.349 viewsMar 30, 2024 at 10:00 AM
|
|
Workers Topple the Bulk Lime Handling Building.691 viewsMar 30, 2024 at 09:21 AM
|
|
Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.484 viewsMar 30, 2024 at 09:21 AM
|
|
Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.385 viewsMar 30, 2024 at 09:08 AM
|
|
Fernald Silo 3 Project - Waste Packaging Station335 viewsMar 30, 2024 at 09:07 AM
|
|
Conceptual Image329 viewsMar 30, 2024 at 09:06 AM
|
|
Fernald Map345 viewsMar 30, 2024 at 09:06 AM
|
|
Fernald Environmental Project (FEMP)378 viewsMar 30, 2024 at 09:03 AM
|
|
Fernald433 viewsMar 30, 2024 at 09:02 AM
|
|
Decontamination & Demolition513 viewsMar 30, 2024 at 09:02 AM
|
|
Public Tours2018 viewsMar 30, 2024 at 08:55 AM
|
|
Arkansas Nuclear One25291 viewsMar 30, 2024 at 08:50 AM
|
|
Dave Mike and ROn1336 viewsMar 30, 2024 at 08:50 AM
|
|
Fort Calhoun Steam Generator Job Coverage1416 viewsMar 30, 2024 at 08:50 AM
|
|
Laundry710 viewsMar 30, 2024 at 08:49 AM
|
|
Gettin' ready2740 viewsMar 29, 2024 at 01:44 PM
|
|
1364 viewsMar 29, 2024 at 10:48 AM
|
|
Core at Ginna1215 viewsMar 29, 2024 at 07:26 AM
|
|
Core at Ginna1722 viewsMar 29, 2024 at 07:26 AM
|
|
Core at Ginna1459 viewsMar 29, 2024 at 07:26 AM
|
|
4663 files on 59 page(s) |
|
|
|
|
|
41 | |
|
|
|
|