NRC Event Reports

Topics

<< < (42/50) > >>

[1] Facility: WESTINGHOUSE ELECTRIC CORPORATION; DEGRADED SAFETY ITEMS CAUSED BY URANIUM BUILDUP (Event: 52090)

[2] Facility: FERMI; SECONDARY CONTAINMENT TECHNICAL SPECIFICATION NOT MET (Event: 52084)

[3] Facility: PALO VERDE; DEGRADED FIRE BARRIER (Event: 52083)

[4] Facility: BRUNSWICK; OFFSITE NOTIFICATION DUE TO NON-WORK RELATED ON-SITE CONTRACTOR FATALITY (Event: 52080)

[5] Facility: DAVIS BESSE; FAILURE TO PERFORM TECHNICAL SPECIFICATION REQUIRED SHUTDOWN (Event: 52079)

[6] Licensee: EXTENDED STAY AMERICA; AGREEMENT STATE REPORT - MISSING TRITIUM EXIT SIGNS (Event: 52052)

[7] Facility: COOPER; LOSS OF TONE ALERT RADIO SYSTEM TOWER (Event: 52070)

[8] Facility: HARRIS; ACCIDENT MITIGATION - MAIN STEAM SAFETY VALVES NOT ADEQUATELY PROTECTED FROM TORNADO MISSILES (Event: 52072)

[9] Facility: BRUNSWICK; OFFSITE NOTIFICATION TO THE UNITED STATES DEPARTMENT OF TRANSPORTATION (Event: 52069)

Navigation

[0] Up one level

[#] Next page

[*] Previous page

Go to full version