NRC Event Reports

Topics

<< < (43/44) > >>

[1] Facility: POINT BEACH; FITNESS FOR DUTY POLICY VIOLATION (Event: 51908)

[2] Facility: PALO VERDE; HIGH PRESSURE SAFETY INJECTION VALVE BONNET LEAKAGE IDENTIFIED DURING REFUELIN

[3] Licensee: JOHNSON ELECTRIC; PART 21 - ANOMALY RELATED TO MICRO SWITCHES (Event: 51907)

[4] Facility: SALEM; ANOMALIES IDENTIFIED DURING VISUAL INSPECTION OF REACTOR VESSEL INTERNALS (Event: 5

[5] Facility: RIVER BEND; HIGH PRESSURE CORE SPRAY SYSTEM INOPERABLE DUE TO A CONTROL ROOM CHILLER TRIP

[6] Facility: SOUTH TEXAS; AUTOMATIC REACTOR TRIP DUE TO GENERATOR LOCKOUT (Event: 51897)

[7] Licensee: THERMO FISHER (THERMO FINNIGAN LLC); AGREEMENT STATE REPORT - POLONIUM 210 SOURCE MISPLACE

[8] Licensee: UNKNOWN; AGREEMENT STATE REPORT - RADIATION LEVEL ON PACKAGE GREATER THAN LIMITS (Event: 51876)

[9] Facility: COOPER; LOSS OF TONE ALERT RADIO SYSTEM TOWER (Event: 51887)

Navigation

[0] Up one level

[#] Next page

[*] Previous page

Go to full version