Quad Cities

Above Average
11 (28.9%)
Average
7 (18.4%)
Below Average
20 (52.6%)

Total Members Voted: 14

Rennhack

Talk About: Quad Cities



DainJer

any newer updates to the Quad List? what was the comment about goats and quad?  lol

DainJer

lol...goes to show, anielsen...respond to your phone messages:) i left one for ya today asking about prices *wink* no return call yet...ill check messages in a few minutes.

Rennhack

Don't forget to vote.  Keep your comments civil.

DainJer

One of the highest "dose" plants for union contractors...i worked 4 outages prior to quad...and the single outage at quad surpassed the doses recieved at the other 4 outages.
on the good side...i hear there building permanent
"break rooms" for the contractors...i spent way to much time in the bartlett trailer....they need a larger place and more seating for sure .

Rennhack

QuoteI spent way to much time in the bartlett trailer.
You had better be careful, people will start to think you hang out with HP's.... at work, here.... where does the insanity end?

DainJer

i hung out in the bartlett trailer because they couldnt ever get an RWP right...or we dosed em out as quick as they created them...or waiting for a TEDE.  or waiting on an briefing. you had to resign on RWP's 2 to 3 times a night
it was Rev. city...there were seriously RWP's with 8 and 9 revisions.
Hang out with HP's? i was put here to keep an eye on you people!!! its a dirty job but somes gotta do it  (ev)
 [smiley=deal.gif]  [smiley=eye.gif]  [smiley=zzwhip.gif]

DainJer

i should warn myself and you(add)about our quad cities talk<--mike of rule 1,3,9....but then you would only point out rule #10....your favorite im sure
:Þ~

Reddy

Whatever happened to Dave Cook?
 ::)  ;)

rlbinc

Quad Unit 2 declared an Alert based on a stuck open Power Operated Relief Valve. They manually scrammed at 95 degrees Torus Temperature, the relief valve remained open long enough to raise Torus temperature to 118 degrees with RHR running in Torus Cooling Mode and the subsequent rapid depressurization violated the Reactor Coolant System 100 degree per hour Cooldown rate.

The PORV did close during the plant cooldown.

The plant was in Cold Shutdown (<212 degrees) in 7.5 hours.

The NRC dispatched a Special Inspection Team.

Quad has three types of Safety Relief Valves on their Main Steam System. Electromatics, Target Rocks, and PORVs. The plant was recently Power Uprated .

Dave Warren

It has been a while since I have been there, but one thing you should be aware of.
When I was there, the meat processing plant stunk up the whole area. Stay on the Illinois side if possible. The Iowa side seems to have a stronger smell.

xavier4255

There's some talk about an up coming outage how many day's dose anyone know?

Already Gone

The outage is scheduled for about 35 days, starting 3/21.  But, hold on.  The steam dryer replacement is postponed.  Apparently the dryer is ready, but the QC paperwork is lagging by months.  This afternoon's rumor (note that it is only a rumor) is that they are going to try to swap it in July.  Sounds suspicious to me, though.  Why would they shut down in the highest demand period of the year? 
"To be content with little is hard; to be content with much, impossible." - Marie von Ebner-Eschenbach

rawtech

I spent one outage there. Throw all of your experience out the window RP's. You're there as a body only! And don't even try to slow production for safety.....Industrial, or radioiogical. THEY WILL NOT HAVE THAT!! Personally, I like trying to do my job. Out there thatwas impossible to do. If you don't mind getting a good paycheck while walking around with blinders on, you'll have a GREAT outage. Sorry, not my style!               RAWTECH

Austria

Official word on the outage is that they will continue as planned MINUS the dryer replacement. They have not yet determined a date for doing the dryer yet.

That is according to a printed memo distributed by Exelon.

Kokokel

Quote from: Rennhack on Nov 30, 2002, 07:51
Don't forget to vote.  Keep your comments civil.
QuadCities is not a bad plant to work.  House Supervision is very reasonable, and Barlet Supervision is always the same and very helpful-good people.  Plant is high dose, people are fair with conractors.

foreverajr

I always enjoyed working at Quad Cities.  The people there are great, both house and contractors.  It is probably one of my favorite plants to work.  The plant is really high dose though. 

vikingfan

Does anyone know if the outage is still scheduled to start on the 4th of may ?  I believe thats the date i saw. does anyone have any details on the length of the outage and what work is being done this time around ? Also if anyone has any good info on lodging.

wlrun3@aol.com

Quote from: vikingfan on Jan 04, 2007, 08:04
Does anyone know if the outage is still scheduled to start on the 4th of may ?  I believe thats the date i saw. does anyone have any details on the length of the outage and what work is being done this time around ? Also if anyone has any good info on lodging.

Quad Cities 1
Cordova Illinois 5/4/2007 3 weeks Shp 18.1, Jhp>9mo's Tricia ext 1268...super 8 motel, 1552 welcome court dr., leclaire, iowa, 563 289 5888, 800 800 8000...new...near...utility rates...

vikingfan

hey thanks for the info ! i hadn't planned on getting bartlett info for the site though.

Tech A

Why is Atlantic asking for techs at Quad?   I thought all the techs from Clinton were suppose to go there in the "Deal or No Deal" with Bartlett.   Don't tell me that some techs were able to break off and go to other sites without filling all the Quad slots.

Eric_Bartlett

Quote from: Tech A on Feb 26, 2008, 09:27
Why is Atlantic asking for techs at Quad?   I thought all the techs from Clinton were suppose to go there in the "Deal or No Deal" with Bartlett.   Don't tell me that some techs were able to break off and go to other sites without filling all the Quad slots.

Beau - to answer your question these are unplanned openings, Quad opened slots last minute (Monday of this week). 
The opinions & views expressed by me are mine and mine alone and may not reflect those of the company.

DJ@Retired

Better to say "The new NRC new work rules are making them hire more people" and EXELON is being to force to hire more or do without, which is not a option in the days of 17 day outages..
A good friend will bail you out of jail. A great friend will be sitting next to you saying "Dam, that was Fun"

Chemistry Nuke

Quad  has made lots of improvements and their dose rates have dropped significantly. Its a great place to work.

GLW

In chronological order, stay tuned for further developments:

29 May 2015 526 pm EDT/2126 GMT
Exelon to decide fate of Quad Cities nuclear power plant in September: CEO

http://www.platts.com/latest-news/electric-power/louisville-kentucky/exelon-to-decide-fate-of-quad-cities-nuclear-21526498



Thu Jul 30, 2015 2:59pm EDT
New power rules may preserve Exelon nuclear plants in Illinois

http://www.reuters.com/article/2015/07/30/us-usa-nuclear-idUSKCN0Q42IV20150730



07/31/2015 | Thomas Overton
Quad Cities Nuclear Plant May Be Retired

http://www.powermag.com/quad-cities-nuclear-plant-likely-doomed-exelon-says/

been there, dun that,... the doormat to hell does not read "welcome", the doormat to hell reads "it's just business"