Help | Contact Us
NukeWorker.com
NukeWorker Menu Moab honeypot

Author Topic: Moab  (Read 37488 times)

0 Members and 1 Guest are viewing this topic.

Offline Dave Warren

  • Radiological Engineer
  • Very Heavy User
  • *****
  • Posts: 2912
  • Karma: 1574
  • Gender: Male
  • Cubs vs. White Sox in the Series this year.
Moab
« on: May 02, 2007, 09:45 »
The word is that the award has been pushed back to the middle of May.

Who's got some inside scoop on this one?

I'm getting some noise that Energy Solutions may be on the top of the DOE's list for this one.

Anybody got info?
« Last Edit: Sep 13, 2007, 09:00 by Rennhack »

milo124

  • Guest
Re: Moab Contract Award Delayed
« Reply #1 on: Jun 20, 2007, 04:45 »
That noise you heard was correct.  EnergySolutions was awarded the Moab contract through 2011.

Offline Dave Warren

  • Radiological Engineer
  • Very Heavy User
  • *****
  • Posts: 2912
  • Karma: 1574
  • Gender: Male
  • Cubs vs. White Sox in the Series this year.
Re: Moab Contract Award Delayed
« Reply #2 on: Jun 21, 2007, 08:38 »
Sometimes those little birdies know what they are talking about.
I guess 80% of rumors are true.... ;)

Offline Dave Warren

  • Radiological Engineer
  • Very Heavy User
  • *****
  • Posts: 2912
  • Karma: 1574
  • Gender: Male
  • Cubs vs. White Sox in the Series this year.
Re: Moab Contract Award Delayed
« Reply #3 on: Jun 24, 2007, 10:58 »
So, we know that Energy Solutions has the 4-year contract for 98 million to move the dirt.
We know that Parallax was purchased by Energy Solutions for federal Rad Con services.
We know that S and K Aerospace took over the Stoller contract at Moab for 22 million.
We know that the politicians and the state of Utah are pressuring the DOE to get this thing cleaned up before it gets in the Colorado River.

We don't know anything about when the work is starting or when some jobs are gonna open up.
If anyone knows any info, please give it up.

alphadude

  • Guest
Re: Moab Contract Award Delayed
« Reply #4 on: Jun 26, 2007, 10:09 »
Its already in the river, LOL... check out the sand bar down stream

you know u want sum of this 105 degree heat...

illegalsmile

  • Guest
Re: Moab Contract Award Delayed
« Reply #5 on: Jun 26, 2007, 04:29 »
Its already in the river, LOL... check out the sand bar down stream

you know u want sum of this 105 degree heat...
so who do we call to make that happen?

Offline Dave Warren

  • Radiological Engineer
  • Very Heavy User
  • *****
  • Posts: 2912
  • Karma: 1574
  • Gender: Male
  • Cubs vs. White Sox in the Series this year.
Re: Moab Contract Award Delayed
« Reply #6 on: Jun 27, 2007, 08:14 »
You can call Parallax at 865-481-8285 but they have to wait for Energy Solutions to request a Rad Con force in Moab.

You can call Energy Solutions 865-376-3147 and talk to their HR Dept.

Bartlett has people there, but that would only be short-term until ES inserts their staff.

Stoller was awarded the new contract for legacy in Moab. I am not sure if they employ any Rad Con folks in Utah. They do at NTS with Navarro. Here is the contact info for Stoller: Phone: 435-259-5131, Contact: Irwin Stewart

S and K Aerospace has a piece of Moab. Rad Con Opportunities? I don't believe so.

All that and $3.00 might get you a gallon of gas, the way things look right now.

Offline jcouch

  • Rad Wiennie
  • Light User
  • **
  • Posts: 22
  • Karma: 16
  • Gender: Male
  • I can't believe they pay me to do this.
Re: Moab Contract Award Delayed
« Reply #7 on: Jun 27, 2007, 02:55 »
just found out s.m. stoller got the fernald contract
If at first you don't succeed, make someone else do it for you ;)

Offline let-it-ride

  • Moderate User
  • ***
  • Posts: 85
  • Karma: 275
  • I love NukeWorker.com!
Re: Moab Contract Award Delayed
« Reply #8 on: Jun 27, 2007, 08:13 »
  Called and Irwin Stewart is going to retire. Guess the Stoller people will be gone anyway.

Bartlett people will probably roll over. (if the price is right)

Stoller got the LM contract for Fernald.

Any other info from anyone?

Offline Dave Warren

  • Radiological Engineer
  • Very Heavy User
  • *****
  • Posts: 2912
  • Karma: 1574
  • Gender: Male
  • Cubs vs. White Sox in the Series this year.
Re: Moab Contract Award Delayed
« Reply #9 on: Jun 28, 2007, 07:50 »
The only other thing I might add to that:

The Stoller Legacy Management Contract includes all the shutdown DOE sites.
Fernald, Moab, Mound, etc.

alphadude

  • Guest
Re: Moab Contract Award Delayed
« Reply #10 on: Jun 30, 2007, 07:44 »
not that this is related but ARC and Portage won TA21 clean up at LANL

illegalsmile

  • Guest
Re: Moab Contract Award Delayed
« Reply #11 on: Jul 02, 2007, 10:42 »
so who is ARC....not the Georgia-based company that spawned so many interesting nicknames in the '90's.

vikingfan

  • Guest
Re: Moab Contract Award Delayed
« Reply #12 on: Jul 02, 2007, 11:11 »
I hope not !! we don't need any more bouncing checks going around !

Offline snowman

  • Moderate User
  • ***
  • Posts: 110
  • Karma: 54
  • I love NukeWorker.com!
Re: Moab Contract Award Delayed
« Reply #13 on: Jul 02, 2007, 03:35 »
I hope not !! we don't need any more bouncing checks going around !
Easy there Kimo Sabi! ARC was a decent company back in the day. Them boys down thar in Georgia used to keep a lotta rental techs working at those nuke jobs. They just lost track of what their core business was... supplying technicians to the nuclear industry, not hydrolasing  the undersides of ocean going vessels with multi million dollar machines. But I digress.

Anybody know what this Stoller Legacy Contract is all about?

Offline Dave Warren

  • Radiological Engineer
  • Very Heavy User
  • *****
  • Posts: 2912
  • Karma: 1574
  • Gender: Male
  • Cubs vs. White Sox in the Series this year.
Re: Moab Contract Award Delayed
« Reply #14 on: Jul 02, 2007, 05:27 »
For example: Stoller’s Moab team has responsibility for several on-site activities. They perform maintenance of erosion protection measures, storm water prevention plan activities, and health and safety oversight of the field work, which includes operating groundwater monitoring and treatment systems, tailings pile dewatering, and soil remediation of both on-site and nearby vicinity properties.

This is from the DOE Site: Mission
The mission of the Office of Legacy Management (LM) is to manage the Department’s post-closure responsibilities and ensure the future protection of human health and the environment. LM has control and custody for legacy land, structures, and facilities and is responsible for maintaining them at levels suitable for their long-term use.

Functions
Protects human health and the environment through effective and efficient long-term surveillance and maintenance;

Preserves and protects legacy records and information;

Supports an effective and efficient work force structured to accomplish departmental missions;

Implements departmental policy concerning continuity of worker pension and medical benefits;

Manages legacy land and assets, emphasizing safety, reuse, and disposition;

Mitigates community impacts resulting from the cleanup of legacy waste and changing departmental missions;

Actively acts as liaison and coordinates all policy issues with appropriate departmental organizations.




illegalsmile

  • Guest
Re: Moab Contract Award Delayed
« Reply #15 on: Aug 14, 2007, 08:42 »
any news opn what's going on  in Moab?

Offline Dave Warren

  • Radiological Engineer
  • Very Heavy User
  • *****
  • Posts: 2912
  • Karma: 1574
  • Gender: Male
  • Cubs vs. White Sox in the Series this year.
Re: Moab Contract Award Delayed
« Reply #16 on: Aug 14, 2007, 09:19 »
Last I heard was that people should start showing up there in September to kill that pile.....

Offline let-it-ride

  • Moderate User
  • ***
  • Posts: 85
  • Karma: 275
  • I love NukeWorker.com!
Re: Moab Contract Award Delayed
« Reply #17 on: Aug 15, 2007, 10:36 »
 
They sure do want to kill that pile, BUT they won't be moving anything for another year.
There is alot of infrastructure that has to be set in place first.
Maybe this time next year there will be about 100 people here with a dozen techs.
Things take time to move.
Plus, there will be no subs, they only want people that will work for Energy Solutions.
So, check in next year to see what is going on.

Offline Dave Warren

  • Radiological Engineer
  • Very Heavy User
  • *****
  • Posts: 2912
  • Karma: 1574
  • Gender: Male
  • Cubs vs. White Sox in the Series this year.
Re: Moab Contract Award Delayed
« Reply #18 on: Aug 16, 2007, 09:40 »
You know this because you are there now?
Or a little secret birdie told you that?
Or you work for Energy Solutions?
Come on, spill the beans.... ;)

Offline Dave Warren

  • Radiological Engineer
  • Very Heavy User
  • *****
  • Posts: 2912
  • Karma: 1574
  • Gender: Male
  • Cubs vs. White Sox in the Series this year.
Re: Moab Contract Award Delayed
« Reply #19 on: Aug 16, 2007, 02:43 »
 They sure do want to kill that pile, BUT they won't be moving anything for another year.
So, check in next year to see what is going on.

Might want to check those sources let-it-ride......
Clerk job and Mechanic job posted today on the ES website.
More to come....you were off by 364 days on that prediction.......lol

Offline Dave Warren

  • Radiological Engineer
  • Very Heavy User
  • *****
  • Posts: 2912
  • Karma: 1574
  • Gender: Male
  • Cubs vs. White Sox in the Series this year.
Re: Moab
« Reply #20 on: Sep 26, 2007, 03:15 »
6 RCT slots opened up with Energy Solutions today.

milo124

  • Guest
Re: Moab
« Reply #21 on: Sep 27, 2007, 01:44 »
Last rumor I heard was no relocation and no diem, but I don't work there.  I wonder what those birdies are saying(singing)?

illegalsmile

  • Guest
Re: Moab
« Reply #22 on: Sep 27, 2007, 02:40 »
I'm guessing no diem since the job is supposed to last 7-10 yrs (what's the latest guess?). No relocation wouldn't surprise me. A lot of places are doing that now. I guess the only way to know for sure is to apply and see if they call you.

Offline Dave Warren

  • Radiological Engineer
  • Very Heavy User
  • *****
  • Posts: 2912
  • Karma: 1574
  • Gender: Male
  • Cubs vs. White Sox in the Series this year.
Re: Moab
« Reply #23 on: Sep 27, 2007, 03:27 »
I think you should count on no diem and no relocation.
This is a good one for building your 401K, not your 69' Camaro.

illegalsmile

  • Guest
Re: Moab
« Reply #24 on: Sep 28, 2007, 05:38 »
How is ES's retirement plan?

Offline UncaBuffalo

  • Mostly Retired
  • Very Heavy User
  • *****
  • Posts: 1818
  • Karma: 4598
  • "How Many Things I Have No Need Of" - Socrates
Re: Moab
« Reply #25 on: Oct 17, 2007, 03:38 »
Gave the site a drive-by...big stack of dirt...looks like job security.


But, Moab (the town) is looking pretty touristy these days...don't like it as well as I used to...
« Last Edit: Oct 18, 2007, 04:57 by UncaBuffalo »
We are plain quiet folk and have no use for adventures. Nasty disturbing uncomfortable things! Make you late for dinner! I can’t think what anybody sees in them.      - B. Baggins

evil-leprachaun

  • Guest
Re: Moab
« Reply #26 on: Oct 18, 2007, 07:55 »
I was in the circus once but grew up and became employed!

illegalsmile

  • Guest
Re: Moab
« Reply #27 on: Jul 10, 2008, 07:34 »
Anyone know what's going on out there?

RNN

  • Guest
Re: Moab
« Reply #28 on: Apr 01, 2009, 08:56 »
Not sure what the status is but Energy Soultions has the contract for the Moab site. This was a artical in the Grand Junction paper today

http://www.gjsentinel.com/hp/content/news/stories/2009/03/31/040109_1A_Moab_cleanup.html

RNN

Offline peteshonkwiler

  • Radiological Ergonomist
  • Very Heavy User
  • *****
  • Posts: 947
  • Karma: 187
  • Gender: Male
  • Banned fromLinkedIn. Now on Twitter @PSloglo
Re: Moab
« Reply #29 on: Apr 01, 2009, 11:14 »
It's too bad they haven't got that going yet.  Digging up Colorado in the springtime.... that has got to be a challenge!  Are they Super Sacking that stuff or straight lining it directly into the gondola cars?
A REM is a REM is a REM
Yea, though I walk through the boundaries of containment, I shall fear no dose, for my meters are with me.  My counters, air sample filters, and smears, they comfort me.

Offline HydroDave63

  • Retired
  • *
  • Posts: 6295
  • Karma: 6629
Re: Moab
« Reply #30 on: Apr 01, 2009, 11:22 »
It's too bad they haven't got that going yet.  Digging up Colorado in the springtime.... that has got to be a challenge!  Are they Super Sacking that stuff or straight lining it directly into the gondola cars?

Luckily it only snows and ices in months containing "R"... ;)

Offline let-it-ride

  • Moderate User
  • ***
  • Posts: 85
  • Karma: 275
  • I love NukeWorker.com!
Re: Moab
« Reply #31 on: Apr 02, 2009, 01:03 »
I am glad the extra money will be going to Moab. Not for Energy Soultions sake, but for the people that live there.
The manager at the site and the DOE rep in Grand Junction should be in jail. What they are doing to the workers and ignoring all radiological controls is criminal! The sad thing is that the people there do what they are told because they want a job. The RPM ignores all radiological controls and does what the DOE rep in Grand Junction tells him to do. He got the job there only because he would do what he was told.
The DOE rep from Grand Junction has cost the tax payers hundreds of thousand of dollars because of his arragance and incompatence. He dailey threatens the people there to do what he tells them or they will be gone or he will hold the money back to do the work.
If the press and the congressman that hold the budget knew of all the criminal acts that the manager and the DOE rep have done, there would be a national outcry to just stop everything until the criminals were replaced. It is that bad!!
In the past the manager had charges against him. Even though several people at the site confirmed the charges and added others, the corporate person said there was no basis because no one put it in writing.
Ok, I am really glad that the pile of dirt is going to be moved 30 miles away. BUT, it could stay there and be monitored by the TAC and save the tax payers the billon of dollars. But, with Obama in charge, just spend, spend, spend, and don't think about tomorrow.

Offline peteshonkwiler

  • Radiological Ergonomist
  • Very Heavy User
  • *****
  • Posts: 947
  • Karma: 187
  • Gender: Male
  • Banned fromLinkedIn. Now on Twitter @PSloglo
Re: Moab
« Reply #32 on: Apr 02, 2009, 04:36 »
let-it-ride,
Maybe this would be a good site to have a journalist get a job as a laborer?
A REM is a REM is a REM
Yea, though I walk through the boundaries of containment, I shall fear no dose, for my meters are with me.  My counters, air sample filters, and smears, they comfort me.

Offline gonzo_4362

  • Very Lite User
  • *
  • Posts: 9
  • Karma: 0
  • Gender: Male
Re: Moab
« Reply #33 on: Apr 02, 2009, 04:16 »
I dont know about that but I do know the techs at the project are the best in the industry!!!!  HANDS DOWN!!!!
Life is what you make of it!!! Live and enjoy life to the fullest!!!

atomicarcheologist

  • Guest
Re: Moab
« Reply #34 on: Apr 04, 2009, 12:59 »
Have all the RP types been hired for this site?

 


NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2024 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?