0 Members and 1 Guest are viewing this topic.

Offline Rennhack

  • Forum Administrator
  • *
  • Posts: 8996
  • Karma: 4683
  • Gender: Male
Shaw Group
« on: Sep 09, 2007, 12:10 »
Talk about this company here.  Don't forget to vote.

Offline Mike McFarlin

  • Safety/Chemist/Health Physicist
  • Very Heavy User
  • *****
  • Posts: 1538
  • Karma: 2145
  • Gender: Male
  • Lead, follow, or get the hell out of the way!
Re: Shaw Group
« Reply #1 on: Oct 02, 2010, 06:20 »
Worked for them at Fitzpatrick, good group of people to work for.
"Duty is the sublimest word in our language. Do your duty in all things. You cannot do more. You should never wish to do less." General Robert E. Lee, C.S.A.

Offline ironcross

  • Very Lite User
  • *
  • Posts: 8
  • Karma: -2
Re: Shaw Group
« Reply #2 on: May 03, 2012, 02:47 »
I have to say The Shaw Group is by far the worst contractor I have worked for in recent years. I completely understand the complexity of tackling a nuclear contract in the states after what happened in Japan, but the severity of upper management completely going off the proverbial deep end is beyond belief here at Vogtle.
If and when Shaw losses this contract due to the poor management shown to Southern Company, not many workers will return due to the poor reputation that Shaw has exhorted. I am one who will travel somewhere else to find a better job than to be treated like ......quote from upper management" one of the inmates" and yes this came from a superintendent. This is the mentality of upper management on the job.

Offline Ksheed

  • Very Lite User
  • *
  • Posts: 4
  • Karma: 0
  • Gender: Male
  • Tell Recruiters to use NukeWorker.com
Re: Shaw Group
« Reply #3 on: May 04, 2012, 11:22 »
I have to say The Shaw Group is by far the worst contractor I have worked for in recent years.
If you don't mind me asking, what is your craft/position?

Offline Rennhack

  • Forum Administrator
  • *
  • Posts: 8996
  • Karma: 4683
  • Gender: Male
Re: Shaw Group
« Reply #4 on: May 04, 2012, 01:17 »
If you don't mind me asking, what is your craft/position?

Very Good question.

I worked for them twice as an ALARA Coordinator, and once as a Safety Engineer, and I had no problems with them at all.  I suspect your position with them (craft, Rad Tech, management, etc) has a great deal to do with your experience.

Offline ironcross

  • Very Lite User
  • *
  • Posts: 8
  • Karma: -2
Re: Shaw Group
« Reply #5 on: May 04, 2012, 01:58 »
If you don't mind me asking, what is your craft/position?
As far as my craft goes, its not a wise idea to divulge too much information due to the Shaw guestapo walking around here , who would love to walk someone to the gate for any and all violations to their company policies.
Shaw is pretty much like any other company who hires way too many "white hats" and not enough actual workers. I understand there has to be some red tape and procedures for a Nuclear job, but this is ridiculously stupid.
Im sure within the week the workforce will be reduced down to a skeleton crew and most of the good people who were here will be unemployed. Does Shaw care one iota? Of course not! Just numbers to them,
In the future when a large job arises and shaw is awarded the contract, not so many people will return and if they do I feel certain Shaw will have hired a disgruntled former employee and how much production will Shaw see from that person?

Offline OldHP

  • Very Heavy User
  • *****
  • Posts: 502
  • Karma: 276
  • Gender: Male
  • Tell Recruiters to use NukeWorker.com
Re: Shaw Group
« Reply #6 on: May 04, 2012, 02:43 »
As far as my craft goes, its not a wise idea to divulge too much information due to the Shaw guestapo walking around here , who would love to walk someone to the gate for any and all violations to their company policies.
Shaw is pretty much like any other company who hires way too many "white hats" and not enough actual workers.

Sounds like a a troller who has too much time at work to me.   :notrolls:
Humor is a wonderful way to prevent hardening of the attitudes! unknown
The government is like a baby's alimentary canal, with a happy appetite at one end and no responsibility at the other. Regan

Offline Ksheed

  • Very Lite User
  • *
  • Posts: 4
  • Karma: 0
  • Gender: Male
  • Tell Recruiters to use NukeWorker.com
Re: Shaw Group
« Reply #7 on: May 04, 2012, 04:54 »
Sounds like a a troller who has too much time at work to me.   :notrolls:
That may be, but it seems to be a trend for that company. Craft workers are unhappy, upper level have no complaints. I have never worked for them, so I do not have any experience to form my own opinion.

Offline ironcross

  • Very Lite User
  • *
  • Posts: 8
  • Karma: -2
Re: Shaw Group
« Reply #8 on: May 04, 2012, 05:20 »
Sounds like a a troller who has too much time at work to me.   :notrolls:
And you must be one of those a@@holes with a white hat, Hope that post helped you further your ego trip
« Last Edit: May 04, 2012, 05:22 by Marlin »

Offline Marlin

  • Forum Staff
  • *
  • Posts: 17049
  • Karma: 5147
  • Gender: Male
  • Stop Global Whining!!!
Re: Shaw Group
« Reply #9 on: May 04, 2012, 05:24 »
 [chill] [chill] [chill] [chill]

 [rulez]
4. Please learn to be respectful, tolerate and support each other.  NukeWorker.com's goal is to help others, not see how many people we can annoy. Do not initiate arguments or tension. This will only cause the triggering of other members and make this site less professional.

Offline tolstoy

  • Moderate User
  • ***
  • Posts: 106
  • Karma: 25
Re: Shaw Group
« Reply #10 on: May 04, 2012, 06:35 »
My two bits that may or may not apply:

I find that in almost every case a guy or gal who comes to work fifteen minutes early, does whatever job is asked of them, and stays out of the gossip/whine/complaint loop will do just fine. I trade seventy-two hours a week for a paycheck. You can own my for seventy-two hours. I'm not there to change the site or complain about the techs. I don't care how far I have to walk in every morning. I assume that wearing safety shoes and saftey glasses come with the trade. 

I see a whole lot of people who come to work and expect an hour to change, gossip, drink coffee and have breakfast. Three in and three out to them means a six hour work day. And if you wait long enough -  about five minutes - they'll tell you that these guys and this plant are idiots because this is how we did it at this plant!

Offline ironcross

  • Very Lite User
  • *
  • Posts: 8
  • Karma: -2
Re: Shaw Group
« Reply #11 on: May 05, 2012, 01:21 »
I come into work least an hour early and I do my job diligently.I keep out of all of the gossip and I do whatever is asked of me, call me a troll .....call me anything you want. 
Like I said in the other post, more than 20% of the workforce has been laidoff this week, and today was no different. This post is about Shaw Group and not me personally. There must be major problems in the front office or in engineering, places I don't get to see. As far as that goes, I haven't noticed a huge change in their parking lot , but in the "craft" parking, its dwindled down to almost nothing. I have a feeling Shaw has screwed the pooch on this job.

Offline mike78756

  • Light User
  • **
  • Posts: 29
  • Karma: 2
  • Gender: Male
Re: Shaw Group
« Reply #12 on: May 05, 2012, 09:57 »
The layoffs the past week are not Shaw's fault if the layoffs are related to nuclear island.. Blame that one on WEC. I was an Engineer with Shaw on the MOX Project and I am now with 3&4 Ops.  Each project has its challenges. One thing I do know is that Shaw employee morale is not very ideal, however, I do believe this project will be successful though. Just my 2 cents..

Offline macgator

  • Light User
  • **
  • Posts: 14
  • Karma: 4
  • Gender: Male
Re: Shaw Group
« Reply #13 on: May 07, 2012, 12:55 »
I find it hard to believe that ironcross has not heard about the issues with the concrete and rebar. Once those issues are resolved with the NRC, the labor count will increase again. This is not residential construction. Shaw is a good company to work for and will be successful there.

Offline ironcross

  • Very Lite User
  • *
  • Posts: 8
  • Karma: -2
Re: Shaw Group
« Reply #14 on: May 08, 2012, 07:01 »
Macgator,
I guess you didn't read my post very well. As I said, I understand the complexity of the task at hand here at Vogtle. There is a major problem in engineering.........Didn't the rebar  get approval before being installed? or were changes made in engineering before NRC approved them?
I guess that's an Ironworkers fault. The soil underneath #3 is giving way.........who screwed the pooch on that one? Guess it was an operator who didn't compact the soil enough.
I would bet my life you are one of the guys in the front office, who is better and smarter than everyone on the job, .........look again Macgator......your job is turning to crap .......... :P

HeavyD

  • Guest
Re: Shaw Group
« Reply #15 on: May 08, 2012, 07:24 »
One thing I found interesting is the statement "... when Shaw loses this contract...:. 

Shaw isn't going to "lose" this contract.  They, along with Westinghouse, Southern and SCANA, make up the consortium that is constructing these new units, both at Vogtle and for us.  We are all legally bound to each other for these projects, come hell or high water.  Yes, there are stipulations that could result in parting of ways, but those scenarios are far, far worse than the current setting.

I cannot speak personally for Shaw at Vogtle.  The Shaw group at the other construction site has been very professional.  There has been no visible downturn in personnel.  Work moves forward, overcoming the many obstacles associated with undertaking the first new nuclear construction projects in over 30 years.  This is NOT building a house or a bridge or a downtown office building.  The Nuclear industry has a slow, methodical, procedure driven way of doing business.  There is no alternative.

As for the rebar issue, that is something that is being worked through with Westinghouse, Shaw and the NRC.

Typically, when folks come here and bad mouth a facility or a contractor, there is more to the story than what is actually presented.  If the whole story was shown, we wouldn't be able to shine :)  Ironcross may be 100% spot on on every account.  I personally doubt that, but that is my personal opinion based on observing human behavior.  (PSYCH 101 :)

Offline macgator

  • Light User
  • **
  • Posts: 14
  • Karma: 4
  • Gender: Male
Re: Shaw Group
« Reply #16 on: May 08, 2012, 09:14 »
ironcross,
Peace my brother, I don't work at Vogtle but I understand mistakes and miscommunications with regulators have occurred. It is also true that the workers in the field are the first to feel the pain when costs need to be controlled. I understand your anger and that you are sticking up for your brothers and sisters out there. I just wanted you to understand that when you trash Shaw, you are demeaning the thousands of us around the world who are doing our best to make them successful. I am confident that the situation will be resolved and that they will ramp up employment again, as we all want our friends and family to have a job. Good Luck and work safe!

Offline Ksheed

  • Very Lite User
  • *
  • Posts: 4
  • Karma: 0
  • Gender: Male
  • Tell Recruiters to use NukeWorker.com
Re: Shaw Group
« Reply #17 on: May 08, 2012, 10:12 »
  Shaw isn't going to "lose" this contract.  They, along with Westinghouse, Southern and SCANA, make up the consortium that is constructing these new units, both at Vogtle and for us. We are all legally bound to each other for these projects, come hell or high water.

Love them or hate them, everyone in the industry should be hoping for Shaw to be successful on both of the new build projects. Huge delays, mistakes, and cost overruns would cripple the "Nuclear Renaissance." There is only one group of people wishing for that. Good luck Shaw workers.

Offline ironcross

  • Very Lite User
  • *
  • Posts: 8
  • Karma: -2
Re: Shaw Group
« Reply #18 on: May 08, 2012, 11:06 »
I don't wish Shaw to loose this contract, or for more of my friends to loose their jobs, but this is reality on this job. Someone screwed up, hopefully not bad enough to shut the job down, but that's what its looking like. We can all turn our heads and look the other way, but when the day ends......sorry fellas ......bad job........... period! And you say " please don't trash Shaw" What in the world are you talking about? Who else is to blame? I can tell you for sure it isn't the workers in the field who are to blame! but you bet your ass they are they are the first to loose their jobs! Not the "white hats" Even though they are the ones who screwed up!
Im sure Bechtel isn't onsite for nothing, and from what I hear , having a job fair in Augusta, hummmmm, wonder where that's going?
So say what you want about Shaw, all I know is there has been layoffs every week for more than a month here. I keep hearing of work starting back in #3 but as of yet..........nada !
And do they layoff the engineers that screwed up? No......lets give them a raise and more responsibility. Ha ha.....wow!..........Shaw!!!!! ha ha ha ha
« Last Edit: May 08, 2012, 12:40 by ironcross »

Offline thirstymick

  • Very Lite User
  • *
  • Posts: 5
  • Karma: 2
Re: Shaw Group
« Reply #19 on: May 08, 2012, 09:47 »
Shaw was my first job in the industry and I feel like I was treated very well.  There is always typical changes in the plan or little things that do not pan out but over all I enjoyed my time with Shaw.  I will say this about them...I was given 40 hrs PTO and from day one and they never missed a check.  I was on a small project so I can't speak for everyone. 

Offline ironcross

  • Very Lite User
  • *
  • Posts: 8
  • Karma: -2
Re: Shaw Group
« Reply #20 on: May 09, 2012, 12:43 »
I received some plans today for a job change. Wouldn't you know that the engineer who drew up the plans, drew them backwards. I mean , come on man! What college did you go to? Did you even think about looking at what you were drawing?
Im sorry fellas but this has been my point all along, the people in the office don't belong running this job at all. Their heads are so swollen and the egos are as big as the job itself.
I would suggest to Shaw , fire all the engineers.....and start over!.......

ArthurRyan

  • Guest
Re: Shaw Group
« Reply #21 on: May 14, 2012, 03:49 »
Most of the Engineers are just given the title "Engineer".  Very few of them have actual degrees or our certified licensed engineers.  A lot of politics and "good ole boy," networking landing them in their positions.  But, that's everywhere not just Shaw!
« Last Edit: May 14, 2012, 03:50 by ArthurRyan »

HeavyD

  • Guest
Re: Shaw Group
« Reply #22 on: May 14, 2012, 09:13 »
Well, everyone that I have come in contact with at our facility who has the title of "Engineer" has a degree in one of the engineering disciplines.

Not saying that the "good ole boy club" doesn't exist.  I simply despise the broad ranged, sweeping and all inclusive statements that basically amount to "I perceive this at my location, therefore it happens EVERYWHERE ELSE.".

Just my 2 cents.

Offline tolstoy

  • Moderate User
  • ***
  • Posts: 106
  • Karma: 25
Re: Shaw Group
« Reply #23 on: May 14, 2012, 04:42 »
Most of the Engineers are just given the title "Engineer".  Very few of them have actual degrees or our certified licensed engineers.  A lot of politics and "good ole boy," networking landing them in their positions.  But, that's everywhere not just Shaw!

I don't believe this for real engineers. There are plenty of ALARA engineers, scheduling engineers, etc., but we all know that those are titles - not to take away from the skills needed. But the NRC isn't going to let someone who has just stepped into the position because he knows the sister of the hiring manager's cousin. When you're calculating stress loads for 24" piping you have to have the qualifications to do the math.

Offline retired nuke

  • Family Man
  • Very Heavy User
  • *****
  • Posts: 1508
  • Karma: 3538
  • Gender: Male
  • No longer a nuke
Re: Shaw Group
« Reply #24 on: May 14, 2012, 09:07 »
When I want real engineering - I find a PE (that's a real, licensed engineer). If they are busy (and they frequently are) I go to an EIT (has the degree, but not the time - again - an official title) and run it by them. A competent EIT will let you know if a PE needs to vet it. When an engineer signs a design, it meets code, or they can be prosecuted for negligence.

Our site doesn't call non- degreed personnel engineers - they are specialists (as I am) that may have field time and experience, but cannot sign off on design changes.

I have tons of respect for engineers - they are wicked smart, and the really good ones can explain stuff to the layman. Help goes both ways - if an engineer needs help with Rad stuff, I try my best to deliver. Then when I need help with engineer stuff, they remember who helped, and who had an attitude...
Remember who you love. Remember what is sacred. Remember what is true.
Remember that you will die, and that this day is a gift. Remember how you wish to live, may the blessing of the Lord be with you

 


NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2024 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?