Help | Contact Us
NukeWorker.com
NukeWorker Menu questions

Author Topic: questions  (Read 6736 times)

0 Members and 1 Guest are viewing this topic.

wlrun3@aol.com

  • Guest
questions
« on: Nov 17, 2008, 11:18 »

   ...did the term "intuitively obvious to the most casual observer" originate in the navy nuclear power program...

   ...is it possible to access industry OE's from a non-industry computer...

   ...is the economically simplified boiling water reactor (ESBWR) designated BWR model 7...is the containment a Mark 4...

   ...what is the status of work hour restrictions on contract RP for the spring 09 season...





 
« Last Edit: Nov 17, 2008, 11:21 by wlrun3 »

Fermi2

  • Guest
Re: questions
« Reply #1 on: Nov 17, 2008, 11:39 »
   ...did the term "intuitively obvious to the most casual observer" originate in the navy nuclear power program...

   ...is it possible to access industry OE's from a non-industry computer...

   ...is the economically simplified boiling water reactor (ESBWR) designated BWR model 7...is the containment a Mark 4...

   ...what is the status of work hour restrictions on contract RP for the spring 09 season...





 


1: No, it derived from the British Navy, circa around 1800 I believe.

2: No

3: No/No

4: I believe they'll be in effect.

Motown homey

  • Guest
Re: questions
« Reply #2 on: Nov 17, 2008, 11:57 »
      ...is it possible to access industry OE's from a non-industry computer...
 

You can access LERs on the NRC website, but you can only access the INPO OEs if you have an INPO approved Username and Password.

Offline retired nuke

  • Family Man
  • Very Heavy User
  • *****
  • Posts: 1508
  • Karma: 3538
  • Gender: Male
  • No longer a nuke
Re: questions
« Reply #3 on: Nov 17, 2008, 12:10 »
 
   ...what is the status of work hour restrictions on contract RP for the spring 09 season...
 

I believe (from my reading of the draft Reg Guide) that the work hour rules only apply to RPs that fulfill an eplan described function - mainly house shift techs. Contract techs may not need to meet the work rules.

Of course, Ops and security have their own task descriptions in the reg guide...
Remember who you love. Remember what is sacred. Remember what is true.
Remember that you will die, and that this day is a gift. Remember how you wish to live, may the blessing of the Lord be with you

wlrun3@aol.com

  • Guest
Re: questions
« Reply #4 on: Nov 17, 2008, 01:51 »


   ...from the nrc web site for Clinton...

      Reactor Vendor/Type: General Electric Type 6
      Containment Type: Wet, Mark III

   ...how will they classify the new GE ESBWR and its containment...

   
   

Motown homey

  • Guest
Re: questions
« Reply #5 on: Nov 17, 2008, 02:49 »
   ...from the nrc web site for Clinton...

      Reactor Vendor/Type: General Electric Type 6
      Containment Type: Wet, Mark III

   ...how will they classify the new GE ESBWR and its containment...
  

Based on the Overview put together by the DOE, www.ne.doe.gov/np2010/pdfs/esbwrOverview.pdf They're both just referred to as ESBWR.  Looking over the PowerPoint, one could say that it's a "wet" containment.
« Last Edit: Nov 17, 2008, 02:49 by Motown homey »

Offline PWHoppe

  • Forum Staff
  • *
  • Posts: 823
  • Karma: 2024
  • Gender: Male
  • CONFIRMED!: The dumbest man on the planet
Re: questions
« Reply #6 on: Nov 17, 2008, 07:50 »
Contract RP personnel are not "covered" employees for the WHL of 10CFR26. They do however fall under the NFR (Nuclear Fatigue Rule). These changes are mandated to be in effect 30 September 2009.
« Last Edit: Nov 21, 2008, 07:03 by PWHoppe »
If a chicken and a half can lay an egg and a half in a day and a half, how many days will it take a grasshopper with a rubber foot to kick a hole in a tin can?

Forum rules..http://www.nukeworker.co

wlrun3@aol.com

  • Guest
Re: questions
« Reply #7 on: Nov 18, 2008, 05:32 »
Based on the Overview put together by the DOE, www.ne.doe.gov/np2010/pdfs/esbwrOverview.pdf They're both just referred to as ESBWR.  Looking over the PowerPoint, one could say that it's a "wet" containment.

   ...thankyou...

   

wlrun3@aol.com

  • Guest
Re: questions
« Reply #8 on: Nov 18, 2008, 05:41 »
Contract RP personnel are not "covered" employees for the WHL of 10CFR26. They do however fall under the NFR (Nuclear Fatigue Rule). These changes are mandated to be in affect 30 September 2009.

   ...thankyou for the reply...

   ...what will the changes do to traditional six and seven twelves contract rp outage schedules...

 

 


NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2024 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?