Facility & Company Information > Shoreham

Shoreham

<< < (6/6)

Mark C:
Nope, pretty much looks the same inside as the day I left in October of 94.  They knocked down a few of the butler buildings on the west side of the plant put up a couple of wind turbines, and a new gas turbine up by the old black start gas turbine, and added a transmission line for the cross sound power cable that goes over to CT, but other than that and needing some paint and landscaping it looks about the same as it has for 40 years.

Fermi2:
Great pics. I am forwarding to my buddies who worked there!

Mark C:
Heres a YouTube video of a pair of youths (I can say that now that I'm an old dude) filming inside Shoreham dated September 16 of 2016.  45 minutes.  Haven't seen it all yet, they just worked their way up to the turbine deck at this point a couple of minutes in.



And a different one:



And a continuation of the second one, mostly the admin and engineering buildings:



Navigation

[0] Message Index

[*] Previous page

Go to full version