Career Path > NRC

INPO Rating

<< < (6/6)

wlrun3@aol.com:

Average outage length for 2011, per the Nuclear Energy Institute, was 43 days.

Nuclear NASCAR:

--- Quote from: DuckAndCover on Jul 14, 2012, 02:44 ---
Is a ten week long outage considered a "longer outage" or is that a normal outage by today's standards.

--- End quote ---

It would be considered a longer outage these days.  However, it could be that long due to replacing steam generators, turbines, transformers, etc....

Navigation

[0] Message Index

[*] Previous page

Go to full version