Average outage length for 2011, per the Nuclear Energy Institute, was 43 days.


Offline Nuclear NASCAR

  • Electrician
  • Forum Administrator
  • *
  • Posts: 938
  • Karma: 3094
  • Gender: Male
  • Everyone needs a Harley. Mine's furry with 4 legs.
Re: INPO Rating
« Reply #26 on: Jul 14, 2012, 11:17 »

Is a ten week long outage considered a "longer outage" or is that a normal outage by today's standards.

It would be considered a longer outage these days.  However, it could be that long due to replacing steam generators, turbines, transformers, etc....
"There is much pleasure to be gained from useless knowledge."

  -Bertrand Russell

 


NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2024 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?