The company requesting applicants is Tetra Tech, which was not provided by the OP and neither did the OP refute the invalid assumption it was UM.....
Okay,...the thread probably moved faster than the OP referred back to it,...still pretty much OBE,...
I want to see the name of the "nuclear engineer" making 30K at U michigan. Especially since the UM reactor has been shut down since the 90's.
Waiting...
The license is not yet terminated, it is plausible, if not likely, the RSO has need of an entry level "nuclear engineer" to help with final reports and RAI's,...
or possibly to assist in developing a submission for the DOE grant applications call for theoretical and computational research relevant to the U.S. magnetic fusion energy sciences program for 2013,...
then again,....we're still OBE here,...