As part of a paper I'm writing I reviewed PWR operating licenses at the NRC's web site looking for MTC limits. I've noticed that some tech spec plots of MTC for CE PWR's (Calvert Cliffs, Fort Calhoun, Millstone-2, St. Lucie-1) lead me to believe that a positive MTC is allowed at 100% power. For example, the plot in the Calvert Cliffs Tech Specs appears to identify the 100% power limit as +0.15e-4.
Am I reading this correctly?
Thank you!