Career Path > Radiation Safety
Which plants Require NUF every 5yr/4yr?
Rennhack:
I'm trying to make a list of which plants require RP techs to retake the NUF every 5 years, every 4 years, and every 3 years, etc.
Please verify the information below. Additionally, please supply the requirements for Duke, and the other unknown sites below.
2 year NUF Sites:
San Onofre
4 year NUF Sites:
Braidwood
Byron
Calvert Cliffs
Catawba
Clinton
Dresden
Hope Creek
LaSalle
Limerick
McGuire
Nine Mile Point
Oconee
Oyster Creek
Peach Bottom
Quad Cities
R.E. Ginna
Salem
Three Mile Island
5 year NUF Sites:
Arkansas Nuclear One
Beaver Valley
Browns Ferry
Brunswick
Callaway
Columbia Generating Station
Comanche Peak
Cooper
Crystal River
D.C. Cook
Davis-Besse
Duane Arnold
Farley
Fermi
Fitzpatrick
Fort Calhoun
Grand Gulf
Hatch
H.B. Robinson
Indian Point
Kewaunee
Millstone
Monticello
North Anna
Palisades
Palo Verde
Perry
Pilgrim
Point Beach
Prairie Island
River Bend
Saint Lucie
Seabrook
Sequoyah
Shearon Harris
South Texas Project
Surry
Susquehanna
Turkey Point
V.C. Summer
Vermont Yankee
Vogtle
Waterford
Watts Bar
Wolf Creek
Sites that don’t accept NUF:
Diablo Canyon
grantime:
Farley is 5 years
gravy58:
Working here with Duke ie..(Catawba,McGuire,Oconne) it has always been 4 years unless something changed this year?
Rennhack:
--- Quote from: gravy58 on Mar 19, 2013, 08:55 ---Working here with Duke ie..(Catawba,McGuire,Oconne) it has always been 4 years unless something changed this year?
--- End quote ---
Thanks, I didn't know and GUESSED. I'll fix it asap. Thanks for the update.
gravy58:
San Onofre is still every 2years. Diablo Canyon has their own doesn't matter if you took it yesterday, you'll take theirs when you show up.
Navigation
[0] Message Index
[#] Next page
Go to full version