Help | Contact Us
NukeWorker.com
NukeWorker Menu Rolphton NPD (Nuclear Power Demonstration)
honeypot

Poll

Rolphton

Above Average
1 (50%)
Average
0 (0%)
Below Average
1 (50%)

Total Members Voted: 2

Author Topic: Rolphton NPD (Nuclear Power Demonstration)  (Read 11605 times)

0 Members and 1 Guest are viewing this topic.

Offline Rennhack

  • Forum Administrator
  • *
  • Posts: 8995
  • Karma: 4683
  • Gender: Male
Rolphton NPD (Nuclear Power Demonstration)
« on: Aug 05, 2006, 04:45 »
If anyone has lodging information for this facility, please post it here.

Offline Rennhack

  • Forum Administrator
  • *
  • Posts: 8995
  • Karma: 4683
  • Gender: Male
Rolphton NPD (Nuclear Power Demonstration)
« Reply #1 on: Aug 05, 2006, 04:51 »
Talk about this facility.  Don't forget to review the forum rules before you post here.  And don't forget to vote.  Keep your comments civil.
« Last Edit: Dec 24, 2006, 12:48 by Roll Tide »

Offline Rennhack

  • Forum Administrator
  • *
  • Posts: 8995
  • Karma: 4683
  • Gender: Male
Rolphton NPD (Nuclear Power Demonstration)
« Reply #2 on: Aug 05, 2006, 05:24 »
If anyone has a favorite hang out, place to shop, or local information for this facility please post it here.

R6girl

  • Guest
Re: Rolphton NPD (Nuclear Power Demonstration)
« Reply #3 on: Jul 25, 2011, 05:24 »
If anyone has lodging information for this facility, please post it here.

Available Sept 1 2011. 2 bedroom waterfront home located 2 kms west of Deep River. references required, first and last, no pets, no smoking. 850/mth plus heat and hydro. please contact via this list.

Offline MercTech

  • Light User
  • **
  • Posts: 36
  • Karma: 29
  • Gender: Male
  • Gotta Glow for the Dough
Re: Rolphton NPD (Nuclear Power Demonstration)
« Reply #4 on: Sep 02, 2014, 10:37 »
I spent a bit over a month working at NPD.

Currently, if working NPD, you meet in the parking lot of the AECL offices in Deep River and ride up in a company vehicle.  You can drive to site but the option to ride up with the project manage in a company truck saves gas.

I rented a room near deep river at a reasonable rate while I was there.

The site itself is in a state of holding pattern after a partial remediation.  The steam side machinery is all removed and you have a large building with peeling paint.  The "active side" is awaiting contract awards for asbestos removal to start and contaminated and irradiated component removal to follow.

I was there for a month doing preps for upcoming work and conducting business representatives of the companies bidding on the project through the contaminated side.
Steven Jerkins
Have dose records, will travel

 


NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2024 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?