« Reply #25 on: Aug 31, 2002, 09:18 »
seems to me to be alara to install yer cameras in a shielded mode when yer building this here better nuke than to waste yer valuable manrem putting them in 'n takin dem out when things get hot.  'cause when yinz get to bulding this here hp prescibed plant, yer annual rem limit is gonna be 500 mrem.
quando omni flunkus moritati

dubble eye, dubble yew, dubble aye!

dew the best ya kin, wit watt ya have, ware yinze are!

Fermi2

  • Guest
Re: Building a better Nuke Plant
« Reply #26 on: Jul 18, 2004, 12:58 »
The Reason they don't put the Primary water on the outside of the tubes is it's less expensive to make a tube that'll hold 2500# than it is to make a vessel that'll hold 2500#. You'd need SG with the same thickness as the RPV. (ASME Code) And you'd jack the price of ONE SG almost 50 to 60 times the amount it is today.

Mike

Offline idrum4food

  • Moderate User
  • ***
  • Posts: 175
  • Karma: 154
  • Gender: Male
  • If ya need air, rope, or wings to get ta where yur goin, ya don't need ta go.
Re: Building a better Nuke Plant
« Reply #27 on: Jul 19, 2004, 09:19 »
Ah yes. The troublesome S/Gs. Precisley why TVA and who ever else their teaming with is looking hard at advanced boilers for their next project at Bellefont, planned to go on line sometime in 2025.

Offline Roll Tide

  • Nearly SRO; Previous RCO / AUO / HP Tech / MM1ss
  • Very Heavy User
  • *****
  • Posts: 1876
  • Karma: 1447
  • Gender: Male
  • Those who wait upon God..rise up on eagles' wings
Re: Building a better Nuke Plant
« Reply #28 on: Jul 19, 2004, 09:25 »
Ah yes. The troublesome S/Gs. Precisley why TVA and who ever else their teaming with is looking hard at advanced boilers for their next project at Bellefont, planned to go on line sometime in 2025.

That, and the fact that the mental midgets on the PWR side of the house decided on a 600 MWe design as their standard. Even though they promised to sharpen their pencils and come back with a 1000 MWe design, that is about 20% smaller than the ABWR!
We hold these truths to be self-evident, that all men are created equal, that they are endowed by their Creator with certain unalienable Rights, that among these are Life, Liberty and the pursuit of Happiness.
.....
And for the support of this Declaration, with a firm reliance on the protection of divine Providence, we mutually pledge to each other our Lives, our Fortunes and our sacred Honor.

Gball

  • Guest
Re: Building a better Nuke Plant
« Reply #29 on: Nov 21, 2004, 09:35 »
Love permanent cables for cameras, audio antennas, monitors, dosimetry, etc. However, when something ain't right, takes forever to find & fix. Just a consideration...

Also consider high gamma fields when poisitioning cameras. They do wear out video receptors quickly.  ::)

 


NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2024 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?