Help | Contact Us
NukeWorker.com
NukeWorker Menu Facility: GRAND GULF; TECHNICAL SPECIFICATION REQUIRED SHUTDOWN (Event: 52936)

Author Topic: Facility: GRAND GULF; TECHNICAL SPECIFICATION REQUIRED SHUTDOWN (Event: 52936)  (Read 2035 times)

0 Members and 1 Guest are viewing this topic.

Offline News Team

  • Subject Matter Expert
  • *
  • Posts: 1461
  • Karma: 1
  • Nuclear News Guru!
Facility: GRAND GULF; TECHNICAL SPECIFICATION REQUIRED SHUTDOWN (Event: 52936)

Region: 4 State: MS
      Unit: [1] [ ] [ ]
      RX Type: [1] GE-6
      NRC Notified By: RYAN MEYER
      HQ OPS Officer: MARK ABRAMOVITZ
   
   
      Notification Date: 08/29/2017
      Notification Time: 14:42 [ET]
      Event Date: 08/29/2017
      Event Time: 12:00 [CDT]
      Last Update Date: 08/29/2017
   
 
 
   
      Emergency Class: NON EMERGENCY
      10 CFR Section:
      50.72(b)(2)(i) - PLANT S/D REQD BY TS
   
   
      Person (Organization):
      VINCENT GADDY (R4DO)
   
 



 
    Unit
    SCRAM Code
    RX CRIT
    Initial PWR
    Initial RX Mode
    Current PWR
    Current RX Mode
 
 
    1
    N
    Y
    65
    Power Operation
    65
    Power Operation

Source: Facility: GRAND GULF; TECHNICAL SPECIFICATION REQUIRED SHUTDOWN (Event: 52936)

 


NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2024 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?