Help | Contact Us
NukeWorker.com
NukeWorker Menu FirstEnergy's Perry Nuclear Power Plant had an Emergency Shutdown Saturday

Author Topic: FirstEnergy's Perry Nuclear Power Plant had an Emergency Shutdown Saturday  (Read 5168 times)

0 Members and 1 Guest are viewing this topic.

Offline Marlin

  • Forum Staff
  • *
  • Posts: 17151
  • Karma: 5147
  • Gender: Male
  • Stop Global Whining!!!

TVA

  • Guest
Wth is an Emergency Shutdown?
Since when is the turbine in the containment?
The article has a drawing of a PWR

Offline Bonds 25

  • Very Heavy User
  • *****
  • Posts: 516
  • Karma: 151
  • Gender: Male
  • HP Tech......Well Thats My Title Anyways.
"But I Dont Wanna Be A Pirate" - Jerry Seinfeld

 


NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2024 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?