;DJust thought I'd put in a plug while folks have the fall planned, and are looking at the spring outages. VY will be replacing several feedwater heaters, and the HP turbine this outage, in preparation for power upgrade. Tentatively scheduled for April, expected to last 30-35 days.

The ski season should be about over

, so housing should be available. Last outage was "foliage season" and some folks had a hard time with the hotels.
For those that have been to VY before, the "GO Cards" are no longer.

That program has ended, and there is not a replacement for contractors.
RP contract is still Numco as far as I know, but the home office handles everything. The local office is closing, and the lady there was hired by Security.
I think VY will be looking for 55+ techs

, with a lot of low dose work in the turbine bldg

. Hope that enough folks come, it sure is better on everyone when there are enough people to go around.