Dan_E.:
--- Quote ---
I think there's too much invested in BLNP Unit 1 to not finish as nuclear, though Unit 2 may be a candidate for non-nuclear completion since Secondary is finished.
--- End quote ---
A word of caution on there on having too much invested to not finish Unit 1 though I don't know what the percentage is. We had one, WPPSS #1, out here that was over 87% complete and they still pulled the plug. Will be starting to tear part of it down soon. Political and public climate and degree of paperwork completed has to be factored in too.
PWHoppe:
RE: Money invested to not complete see Midland, Shoreham, Seabrook, Perry, Marble Hill, etc, etc, ...
BTW...speaking of Bellafonte...I LOVE the Banana Boat song ;)
Roll Tide:
--- Quote ---
BTW...speaking of Bellafonte...I LOVE the Banana Boat song ;)
--- End quote ---
You have struck a sensitive nerve here on that subject. I grew up above Sublet's Ferry Landing, which used Bellefonte as the landing on the othe side of the Tennessee back before Guntersville Dam was built.
I can assure you it isn't a word that rhymes with Bellafonte, it's two incredibly flat syllables (Bell-Font) when spoken in the native tongue. (Of course, when my sister mentions working at Bellefonte, it does sound like Bellafonte, and is worse than nails on a chalkboard.)
The fact that TVA still has an active construction permit, and none of those other plants listed are still on the books makes TVA the only "in-progress" nuclear choice. Bellefonte is a better choice than Watts Bar Unit 2 due to parts scavenging. Watts Bar employees hate it when Sequoyah refers to WBN2 as the mock-up and storehouse, but it is.
Bellefonte being B&W instead of Westinghouse has spared it. Additionally, the NRC inspectors I have had conversations with over the years have all stated Bellefonte is the best built nuclear plant in the country. Politics was the reason Watts Bar 1 was finished instead of Bellefonte 1 (TN congressional delegation had more pull than AL.)
SloGlo:
--- Quote ---I heard TVA is hurting financially - not sure if they could pull off building any new nukes right now.
--- End quote ---
sell the land to a group who has the money. the permits should follow the sale.
HydroDave63:
--- Quote ---
TVA hurting financially? Thought they were a USG entity. The federal budget must be getting tight.
The 'T' stands for Tennesse. It may be a state government run facility, but NO comercial power plants are federally operated.
--- End quote ---
Most incorrect. TVA has Federal jurisdiction in 7 states for its electric distribution and generation, etc. No single state would have ever been able to arrange water rights for the hydroelectric parts of the TVA system when TVA was first created, with Federal financing. The first part of the FAQ page reads as follows:
What is TVA?
The Tennessee Valley Authority is a federal corporation and the nation's largest public power company. As a regional development agency, TVA supplies affordable, reliable power, supports a thriving river system, and stimulates sustainable economic development in the public interest. TVA operates fossil-fuel, nuclear, and hydropower plants, and has also begun producing energy from renewable sources. It manages the nation's fifth-largest river system to minimize flooding, maintain navigation, provide recreational opportunities, and protect water quality in the 41,000-square-mile watershed.
When was TVA established?
TVA was set up by the U.S. Congress in 1933, primarily to provide flood control, navigation, and electric power in the Tennessee Valley region.
http://www.tva.gov/abouttva/keyfacts.htm for FAQ's about TVA