NukeWorker Forum

Facility & Company Information => Region IV (Western) => Fort Calhoun => Topic started by: SmallTownNuke on Nov 17, 2012, 09:31

Title: Fort Calhoun Restart Checklist
Post by: SmallTownNuke on Nov 17, 2012, 09:31
The NRC released a more detailed version of the Fort Calhoun Restart Checklist earlier this week.  The major points in my opinion are:
Safety Culture
Containment Internal Structure design margin (not pressure boundary integrity)
Containment electrical penetration have potential LOCA level radiation degradation
Flood protection procedures and structures (Yellow finding, 2010)
Reactor Protection System contactor failure (White finding, 2011)
Electrical Distribution 480V breaker fire(Red finding, 2012)


Here's the link:  http://pbadupws.nrc.gov/docs/ML1231/ML12318A319.pdf
Title: Re: Fort Calhoun Restart Checklist
Post by: Ksheed on Dec 18, 2013, 08:21
Congratulations to all the workers at Fort Calhoun. Many doubted that you would make it to this point, but you proved them wrong. I wish you the best of luck on your start up operations.

http://www.omaha.com/article/20131217/NEWS/131218891 (http://www.omaha.com/article/20131217/NEWS/131218891)