NukeWorker Forum
Career Path => Radiation Safety => Topic started by: greatFox on Dec 01, 2013, 06:12
-
Hey all,
Just curious to see what contractor ended up with the Oak Ridge work that was posted here under several contractors. I know it wasn't Bartlett because I went with them and they didn't get it. As far as I could tell it was just luck of the draw if you got it or not. Bartlett was the first to post the job so I went with them, but maybe I should have waited for another contractor...
Thanks
--Todd
-
Just curious to see what contractor ended up with the Oak Ridge work that was posted here under several contractors. I know it wasn't Bartlett because I went with them and they didn't get it. As far as I could tell it was just luck of the draw if you got it or not. Bartlett was the first to post the job so I went with them, but maybe I should have waited for another contractor...
Since you don't mention what contract specifically, I will have to guess. I believe you are referring to the UT-Battelle/ORNL contract. The answer is "The wining vendor rolled over the incumbent candidates." -- So, unless you were already there, it didn't matter who 'won'. The subcontract was awarded to Spectra Tech, Inc.
-
Spectra Tech was awarded the contract. Basically there were several (11) incumbent RCT positions that were rolled into a single contract instead of Spectra Tech, LSI, and ?. Easier for UT-B to manage. No new jobs were created.