NukeWorker Forum
Career Path => Radiation Safety => Topic started by: Rennhack on Jul 29, 2014, 03:34
-
We have talked about whether it's a 5 year, or 4 years site for seniors, how about Juniors?
Which sites require Juniors to take the NUF, and do they require an 80%, or a 70?
See also:
http://www.nukeworker.com/forum/index.php?topic=36246.0
Requires Jr NUF
FENOC
Beaver Valley
Davis Besse
Perry
Entergy
Arkansas Nuclear One
Grand Gulf
River Bend
Waterford 3
FitzPatrick
Indian Point Energy Center
Palisades
Pilgrim
Vermont Yankee
Exelon
Braidwood
Byron
Clinton
Dresden
LaSalle
Limerick
Oyster Creek
Peach Bottom
Quad Cities
Three Mile Island
Calvert Cliffs
Ginna
Nine Mile Point
Duke Energy
Brunswick
McGuire
Catawba
Oconee
Crystal River
Robinson
Shearon Harris
South Texas Project
SCANA
VC Summer (70%)
Does not require Jr NUF
DC Cook
Seabrook
Cooper
Columbia
Fort Calhoun
Hope Creek
Millstone
Prairie Island
Salem
Susquehanna
-
I'll start:
Seabrook does not require Jr's to take the test. * (http://sharepoint.bhienergy.com/outageinfo/seabrook/Lists/Posts/Post.aspx?ID=7)
-
I'll start:
Seabrook does not require Jr's to take the test. * (http://sharepoint.bhienergy.com/outageinfo/seabrook/Lists/Posts/Post.aspx?ID=7)
But, Seabrook is the only site I have been to since 1991 that makes you take the test even if you passed the NRRPT...
Closer to topic, I have never been anywhere that made Juniors take the NUF (to my knowledge.)
-
Progress Energy/ Duke plants do require passing the NUF to work as a Jr. Tech.
Old HP
-
VY required a 70 for junior.
May hold true for all of Entergy.
-
I did not have to take the NUF as a Contractor Jr. at Palo Verde. The NUF was available for those that wish take it. They had their own site specific exam.
-
I did not have to take the NUF as a Contractor Jr. at Palo Verde. The NUF was available for those that wish take it. They had their own site specific exam.
Good to know, when I worked there as a Jr, they DID require Jr's to take it. But that was soooo long and many RPM's ago.
-
Duke Energy does not require a Junior RP to take or pass the NUF.
-
I did not have to take the NUF as a Contractor Jr. at Palo Verde. The NUF was available for those that wish take it. They had their own site specific exam.
if I remember write, the utility tests where often moor difficult that the n.e.u., or today's n.u.f.
-
VY required a 70 for junior.
May hold true for all of Entergy.
As a JR Tech, every site I've been to has required an NEU exam score of 70% for JRs. The plants were Arkansas Nuclear, Waterford 3, Vermont Yankee and Davis-Besse.
-
VY required a 70 for junior.
May hold true for all of Entergy.
Results good for 5 years at any Entergy site.
-
Results good for 5 years at any Entergy site.
Ok.
As a JR Tech, every site I've been to has required an NEU exam score of 70% for JRs. The plants were Arkansas Nuclear, Waterford 3, Vermont Yankee and Davis-Besse.
Thank you, Entergy required 70%, as well as FENOC
Duke Energy does not require a Junior RP to take or pass the NUF.
Thankyou.
I did not have to take the NUF as a Contractor Jr. at Palo Verde. The NUF was available for those that wish take it. They had their own site specific exam.
When was this? Was it recently? Now days everyone but Diablo uses the NUF.
VY required a 70 for junior.
May hold true for all of Entergy.
Thanks.
Progress Energy/ Duke plants do require passing the NUF to work as a Jr. Tech.
I understand that Progress Energy/ Duke plants require the NUF for Jrs. 70% or 80%?
-
I worked as a Jr. RP from 2004 to 2009 at PV. It could be different now.
-
Progress Energy/ Duke plants do require passing the NUF to work as a Jr. Tech.
Duke Energy does not require a Junior RP to take or pass the NUF.
Color me confused. Which is it? Just the progress part of Duke?
-
Color me confused. Which is it? Just the progress part of Duke?
Bump.
-
I understand that Progress Energy/ Duke plants require the NUF for Jrs.
Do they need 70% or 80%?