NukeWorker Forum
Career Path => Nuclear Operator => Topic started by: Higgs on Oct 03, 2012, 01:37
-
Whelp,
Just finished and passed my PWR written exam, "unofficially" until the NRC says so, of course.
However, with the score I achieved, and barring any unforeseen issues in the simulator or JPMs, I should be getting my PWR license!
w00t!
Justin
-
10/10 passed. 14 started the class..., one dropped in gfes, three dropped at audit.
Justin
-
Awesome!! Congrats!! 3 Loop or 4 Loop?
-
3 looper.
Thanks all!
-
We are proud of you!
K
-
Great job man, you should be very proud!
-
Congratulations........You have worked hard and proved yourself.
-
3 looper.
Thanks all!
Now we have to get you on a gas-cooled unit in the UK, so BZ has to come to YOU for checkouts ;)
-
Now we have to get you on a gas-cooled unit in the UK, so BZ has to come to YOU for checkouts ;)
I am sure he could handle it!!! +K
-
3 looper.
Thanks all!
Couldn't handle a 4 Loop? :)
-
Now we have to get you on a gas-cooled unit in the UK, so BZ has to come to YOU for checkouts ;)
Hey if it involved working in the UK I could do it!
-
Couldn't handle a 4 Loop? :)
Hahaha nope, those extra rods and EOPs would have been too much. ;D
Justin
-
Don't 3 Loops have the same number of EOPs?
-
I always joke operating PWRs is so easy I had to go to a 2 Unit site to make up for the single unit BWR I left. :)
-
Don't 3 Loops have the same number of EOPs?
Well, I'm assuming not since my station gave us a practice test borrowed from another plant (a 4 looper), and they didn't correct all the differences, including references to ES-0.6. We don't have that. ;D
Justin
I always joke operating PWRs is so easy I had to go to a 2 Unit site to make up for the single unit BWR I left. :)
Haha yeah, even after the test, there is still a BWR/PWR rivalry with me here. All in good fun!
Justin
-
E0 ES.01, 02 03 04, 05, E 1, E 2, E 3
Es 1.1, 1.2. 1.3, 1.4
ECA 0.0 , 0.1, 0.2
ECA 1.1, 1.2. 1.3
ECA 2.1
ECA 3.1, 3.2, 3.3
FRS 1, 2 and 3
FRC 1 , 2 and 3
FRP 1, 2 and 3
FRH 1, 2, 3, 4, 5
FRZ 1 and 2
FRI, 1, 2, 3, 4, and 5
-
Yep we only go up to ES-0.4.
Rest looks the same.
Justin
-
Plus we have a lot of EAs (Simplified instructions on how to restore systems)
Question: After an SI you stay in E-0. How do you verify actuations of safety systems and containment isolation? Is it an imbedded step? Or some other document?
Also forgot FR.0 Critical Safety Function Status Trees.
-
Plus we have a lot of EAs (Simplified instructions on how to restore systems)
Question: After an SI you stay in E-0. How do you verify actuations of safety systems and containment isolation? Is it an imbedded step? Or some other document?
Also forgot FR.0 Critical Safety Function Status Trees.
There is a step to perform attachment A-0.11 in timely manner, which is verification of automatic actions. That comes after verifying SI, AFW, and the prz isolated, and before the other diagnostic steps.
Justin
-
That is ES.05 (Or ES.06 in some plants)
-
Ah gotcha. Thanks!
Justin
-
3 looper.
Thanks all!
Couldn't handle a 4 Loop? :)
[whistle] ROFL
Seriously Justin,,, Nice Job,,, [clap]
-
Congratulations!!
-
Great job, Justin!
-
Thanks all!
Justin
-
Thanks all!
Justin
I think you can safely refer to the WMFO Master Chief as "Janitor" :P
-
Congrats!
Hopefully I'll be able to celebrate the same thing very soon. Audit coming up in a couple weeks, and then the big one in Dec...
-
I think you can safely refer to the WMFO Master Chief as "Janitor" :P
Hahaha that's right!
Congrats!
Hopefully I'll be able to celebrate the same thing very soon. Audit coming up in a couple weeks, and then the big one in Dec...
Thank you and good luck!
Justin
-
It's official, 10/10 passed.
Justin
-
It's official, 10/10 passed.
Justin
-
It's official, 10/10 passed.
Justin
Congrats Justin.