NukeWorker Forum

News and Discussions => Nuke News => NRC Event Reports => Topic started by: News Team on Aug 10, 2017, 09:01

Title: Facility: SURRY; TECHNICAL SPECIFICATION REQUIRED SHUTDOWN FOR REACTOR COOLANT SYSTEM LEAKAGE (Event: 52894)
Post by: News Team on Aug 10, 2017, 09:01
Facility: SURRY; TECHNICAL SPECIFICATION REQUIRED SHUTDOWN FOR REACTOR COOLANT SYSTEM LEAKAGE (Event: 52894)

Region: 2 State: VA
      Unit: [1] [ ] [ ]
      RX Type: [1] W-3-LP,[2] W-3-LP
      NRC Notified By: ALAN BIALOWAS
      HQ OPS Officer: DONG HWA PARK
   
   
      Notification Date: 08/09/2017
      Notification Time: 17:35 [ET]
      Event Date: 08/09/2017
      Event Time: 16:06 [EDT]
      Last Update Date: 08/09/2017
   
 
 
   
      Emergency Class: NON EMERGENCY
      10 CFR Section:
      50.72(b)(2)(i) - PLANT S/D REQD BY TS
      50.72(b)(3)(ii)(A) - DEGRADED CONDITION
   
   
      Person (Organization):
      FRANK EHRHARDT (R2DO)
   
 



 
    Unit
    SCRAM Code
    RX CRIT
    Initial PWR
    Initial RX Mode
    Current PWR
    Current RX Mode
 
 
    1
    N
    Y
    32
    Power Operation
    0
    Hot Shutdown

Source: Facility: SURRY; TECHNICAL SPECIFICATION REQUIRED SHUTDOWN FOR REACTOR COOLANT SYSTEM LEAKAGE (Event: 52894) (http://www.nrc.gov/reading-rm/doc-collections/event-status/event/en.html#en52894)