Help | Contact Us
NukeWorker Menu

Fort Calhoun Restart Checklist

Started by SmallTownNuke, Nov 17, 2012, 09:31

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

SmallTownNuke

The NRC released a more detailed version of the Fort Calhoun Restart Checklist earlier this week.  The major points in my opinion are:
Safety Culture
Containment Internal Structure design margin (not pressure boundary integrity)
Containment electrical penetration have potential LOCA level radiation degradation
Flood protection procedures and structures (Yellow finding, 2010)
Reactor Protection System contactor failure (White finding, 2011)
Electrical Distribution 480V breaker fire(Red finding, 2012)


Here's the link:  http://pbadupws.nrc.gov/docs/ML1231/ML12318A319.pdf

Ksheed

Congratulations to all the workers at Fort Calhoun. Many doubted that you would make it to this point, but you proved them wrong. I wish you the best of luck on your start up operations.

http://www.omaha.com/article/20131217/NEWS/131218891


NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2025 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?