Help | Contact Us
NukeWorker.com
NukeWorker Menu

Nuclear Pictures

NukeWorker online photo album.

Davis Bessie Nuclear Power Plant
The newly replaced reactor head sits in the containment vessel at the Davis-Besse Nuclear Power Station in Oak Harbor, Ohio, Friday, Feb, 27, 2004. The power station has been shut down for two years while the reactor head was replaced due to corrosion damage. It is now up to the Nuclear Regulatory Comission to authorize a restart. 
Keywords: Davis Bessie Nuclear Power Plant

Davis Bessie Nuclear Power Plant

The newly replaced reactor head sits in the containment vessel at the Davis-Besse Nuclear Power Station in Oak Harbor, Ohio, Friday, Feb, 27, 2004. The power station has been shut down for two years while the reactor head was replaced due to corrosion damage. It is now up to the Nuclear Regulatory Comission to authorize a restart.

DebFrnkJry.jpg ineel_image1.jpg pict370.jpg pict480.jpg l_39d623d0038844b892791222304f2e1b.jpg
File information
Filename:pict370.jpg
Album name:Rennhack / Davis-Besse
Keywords:Davis / Bessie / Nuclear / Power / Plant
Credits:AP Photo/Daniel Miller
Filesize:32 KiB
Date added:Sep 15, 2005
Dimensions:337 x 512 pixels
Displayed:2392 times
URL:https://www.nukeworker.com/pictures/displayimage.php?pid=3668
Favorites:Add to Favorites


NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2024 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?