River Bend 1 — Nuclear Reactor Data & Live Status

Live reactor status, daily power data, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for River Bend 1.

?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
18
Excellence
#90 of 94
Bottom Quartile
?
Current reactor power level from the most recent NRC daily report.
100%
Power
ONLINE
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
173
Current Run
days
#43 of 95
Mid Quartile
?
Longest recorded period of continuous operation between outages.
1,228
Record Run
days
#1 of 95
Top Quartile
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (606 days for this 24-month cycle unit) with no trips to 0% power.
1
B2B Runs
#87 of 87
Bottom Quartile
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
86.4%
Capacity Factor
#83 of 95
Bottom Quartile
?
Community rating score (Bayesian-adjusted). Based on 48 votes. Ranked against all rated facilities.
36.6
Rating
48 votes
#94 of 97
Bottom Quartile
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
21
Scrams
#93 of 94
Bottom Quartile
?
Years since commercial operation began. License remaining: 19.3 years.
39.9
Operating Age
years
19.3 yrs remaining
?
Composite Operational Excellence Score for River Bend 1 — average percentile rank across 7 publicly observable metrics in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). Toggle the time window (3yr / 5yr / Lifetime) to see how this unit's standing shifts. Each dimension percentile-ranked across the active US fleet. Sub-score = average of components. Composite = average of the three sub-scores.

NukeWorker's Operational Excellence Score 5-yr composite · ranks 90 of 94 ↑4

Time window
NukeWorker's
Operational
Excellence Score
18/100
Bottom Quartile · #90/94
5-year window

River Bend 1 ranks #90 of 94 active US units on NukeWorker's Operational Excellence Score over the 5-year window. Strongest area: B2B Avg Streak (70th percentile). Weakest: Startup Duration (5th percentile).

Reliability
36
Capacity factor + Forced outages + B2B streaks
Efficiency
8
Fuel utilization + Refuel duration
Discipline
10
Startup duration + Scram count
Cohort Rankings apples-to-apples comparison within each peer group
Reactor type: #29 of 31 BWR
Containment: #3 of 4 Mark III (BWR)
Cycle length: #38 of 40 24-month cycle
Fleet rank above (90 of 94) compares all active US units; cohort ranks compare only against units sharing this property.
Per-dimension breakdown (7 metrics)
Capacity Factor 16th
86.1% (higher better, Reliability)
Forced Outage Days/yr 22th
8.0d (lower better, Reliability)
B2B Avg Streak 70th
674d (higher better, Reliability)
Fuel Utilization 6th
93.1% (higher better, Efficiency)
Refuel Duration 9th
47d (lower better, Efficiency)
Startup Duration 5th
10.1d (lower better, Discipline)
Scrams (5-year) 16th
0.8/yr (lower better, Discipline)

Each dimension's percentile is computed across the active US fleet (94 units with sufficient history). Sub-score = average of its component percentiles. Composite = average of the three sub-scores. 5-year window. View full leaderboard →

Methodology

NukeWorker's Operational Excellence Score is a composite ranking that combines 7 publicly observable performance metrics into a single 0-100 number per US nuclear unit.

How it's computed: Each unit's raw value is converted to a percentile (0-100) within the 94 active US units that have at least 2 completed refueling cycles. The 7 percentiles are averaged into 3 sub-scores (Reliability, Efficiency, Discipline), and those are averaged into the final composite.

Active window — 5-year:

  • Reliability — Capacity factor (5yr), forced outage days/yr (5yr), B2B avg streak (lifetime)
  • Efficiency — in-cycle fuel utilization (3yr), median refuel duration (5yr)
  • Discipline — robust mean startup duration, scrams/yr (5yr, annualised)

Cohort rankings: alongside the fleet rank, each unit gets ranked within its reactor type (PWR/BWR), containment design (Ice Condenser, Mark I, etc.), and cycle length (12/18/24-month). Useful for apples-to-apples comparisons.

What's excluded: subjective community ratings, confidential INPO ratings, financial metrics. We only use publicly available NRC + cycle data.

Why three windows? 5yr (default) is the industry standard. 3yr captures recent operational changes and post-pandemic recovery. Lifetime gives newer units a fair comparison and reveals long-term consistency.

Edge cases: units with fewer than 2 cycles (e.g., Vogtle 4) show "Provisional". Decommissioned units excluded.

Refresh cadence: recomputed daily. Each window cached separately.

A data-derived proxy for operational performance; not affiliated with INPO. INPO ratings are confidential and qualitative — ours is public and quantitative.

5-yr trend: 2021: 11/100 (#91/93)2022: 10/100 (#89/92)2023: 16/100 (#89/92)2024: 38/100 (#68/93)2025: 14/100 (#91/94)2026: 20/100 (#87/94) ↑ +6.3 pts vs 2025
Compare River Bend 1 head-to-head with up to 3 other units. Compare now

Capacity Factor (365-Day)

?
100%
Current
95.2%
365-Day Avg
#59
of 94 plants
Min: 0% Max: 100% 21 days <80%

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.

Power History (12-Month)

?
Daily power output as a percentage of rated capacity over the past 365 days. Green segments indicate full power (90%+), yellow shows reduced output, and red indicates significant power reductions or shutdowns.

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Lifecycle & Tenure
Operating Age: 39.9 Yrs
Build Time: 9.2 Yrs
Lic. Remaining: 19.3 Yrs
Production & Power
Lifetime CF: 86.4%
Efficiency: 31.3%
Generated: 200.3 TWh
Reliability & Outages
Record Run: 1,228 Days
Refuelings: 14
Avg Startup: 13.2 Days

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
5485 U.S. Highway 61
St. Francisville, LA 70775, USA
Get Directions
Phone: (225) 635-6094

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2026.
$110
Lodging/Night
$68
M&IE/Day
$178
Total/Day
Standard Rate, LA

Unemployment Benefits LA

?
Maximum state unemployment insurance benefits for LA. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$275
Max Weekly
26
Max Weeks
$7,150
Max Total
7-day waiting period before benefits begin

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Entergy
Architect Engineer: S&W
Constructor: S&W

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: BWR
Containment: BWR-MARK 3
NSS Supplier: GE 6
Thermal Power: 3091 MWt
Net Capacity: 968 MWe
Efficiency: 31.3%
Status: Operating

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000458
License #: NPF-47
License Type: OL-FP
Const. Permit: 1977-03-25
Operating Lic: 1985-11-20
Commercial Op: 1986-06-16
License Renewed: 2018-12-20
License Exp: 2045-08-29

Market & Region

?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region: SERC — SERC Reliability Corporation
Census Region: WSC — West South Central
Balancing Authority: MISO — Midcontinent Independent System Operator (ISO/RTO)
Market Structure: Regulated — Rate-regulated utility (cost-of-service pricing)