This is what HR told me, FWIW
"The POSS consists of and is scored from Assembly, Mechanical Concepts, Tables and Graphs, Reading Comprehension and Mathematical Usage.
The MASS consists of and is scored from Assembly, Mechanical Concepts, Reading Comprehension and Mathematical usage."
She will not tell me what test I did poor on.. I think it was the Line tracing or Math since Tables and Graphs was not part of my test. It was the POSS B test that I took.
Not passing the test is the worst part of the whole thing, In the power plant world that test means a lot. I will take the test every chance I can tell I pass it.
Thanks for the reply Starkist.. Maybe broadzillia can shed some light on it