I find myself in the unfortunate position of dressing up our exam bank, and placing questions in the proper classification according to NUREG-1122.
I've mostly got it figured out, but am having problems with question that fall into the Transient Accident Analysis (TAA) realm, specifically that have to do with USAR assumptions. For instance, a feed rupture occurs, what are the assumptions assumed in the analysis? (Offsite power available, one train ESF down, etc) I can't find anything that really fits, looking through the generic, system, generic abnormal ops, westinghouse abnormal ops.. Can anyone give me guidance of what's done elsewhere?
Thanks!