Pilgrim 1 — Decommissioned Reactor Data & History

Operational history, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Pilgrim 1.

Decommissioned

Permanently shut down on 2019-05-31. View Outage History →

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Lifecycle & Tenure
Operating Age: 46.5 Yrs
Build Time: 4.3 Yrs
Lic. Remaining: N/A Yrs
Production & Power
Lifetime CF: 88.9%
Efficiency: 34.3%
Generated: 110.2 TWh
Reliability & Outages
Record Run: 2,414 Days
Refuelings: 11

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
600 Rocky Hill Road
Plymouth, MA 02360, USA
Get Directions
Phone: (508) 830-8000

Per Diem Data

?
GSA per diem rates for the area near this facility. Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel. Links open the official GSA rate lookup.

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Holtec International
Architect Engineer: BECH
Constructor: BECH

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: BWR
Containment: BWR-MARK 1
NSS Supplier: GE 3
Thermal Power: 1998 MWt
Net Capacity: 685 MWe
Efficiency: 34.3%

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000293
License #: DPR-35
License Type: OL-FP
Const. Permit: 1968-08-26
Operating Lic: 1972-09-15
Commercial Op: 1972-12-01
License Exp: 2012-06-08