All readers, you need to see the abhorant piece of work; the EPR from Areva. Go to AREVA EPR and view thru the files to the vid and photo sections. Reminders of 'the day' are ever present and if they do start building these in the US we could see a repeat of SATSOP and Midland to name a couple. This plant design is not GEN III, it is the same old tired seventies nuke we all are used to as a PWR, someone needs to take some initiatve and stop them. Less pumps? Less Valves? how with four safety trains and four safety diesels as well as two non safety. The faster build for ESBWR and the AP 600-1000 units will revive our industry, this "Robust" megalithic monument to our Navy leadership could end up as our industry's demise. Olkiluoto 3 is being built in Finland and is a EPR, it started in 04/2004, they are just now pouring the can walls. Six+, maybe 7-8 years construct time given the inevitable problems and less than 4 years for either the ESBWR or the APs', the proof is in the product or for us the production(of MW). old coot