Ratings
Browns Ferry
- Above Average
- 20 (33%)
- Average
- 15 (25%)
- Below Average
- 24 (40%)
Facility Statistics
Lifecycle & Tenure
Operating Age: 51.6 Yrs
Build Time: 7.2 Yrs
Lic. Remaining: 7.8 Yrs
Production & Power
Lifetime CF: 62.8%
Efficiency: 31.8%
Generated: 187.8 TWh
Reliability & Outages
Record Run: 710 Days
Refuelings: 9
Ownership & Construction
Technical Specs
Reactor Type:
BWR
Containment:
BWR-MARK 1
NSS Supplier:
GE 4
Thermal Power:
3952 MWt
Net Capacity:
1256 MWe
Efficiency:
31.8%
Status:
Operating
Licensing
Docket #:
05000259
License #:
DPR-33
License Type:
OL-FP
Const. Permit:
1967-05-10
Operating Lic:
1973-12-20
Commercial Op:
1974-08-01
License Renewed:
2006-05-04
License Exp:
2033-12-20
Facility Map
34.7058, -87.1202