Ratings
Browns Ferry
- Above Average
- 20 (33%)
- Average
- 15 (25%)
- Below Average
- 24 (40%)
Facility Statistics
Lifecycle & Tenure
Operating Age: 51 Yrs
Build Time: 7.8 Yrs
Lic. Remaining: 8.3 Yrs
Production & Power
Lifetime CF: 90.2%
Efficiency: 31.9%
Generated: 270.6 TWh
Reliability & Outages
Record Run: 741 Days
Refuelings: 14
Ownership & Construction
Technical Specs
Reactor Type:
BWR
Containment:
BWR-MARK 1
NSS Supplier:
GE 4
Thermal Power:
3952 MWt
Net Capacity:
1259 MWe
Efficiency:
31.9%
Status:
Operating
Licensing
Docket #:
05000260
License #:
DPR-52
License Type:
OL-FP
Const. Permit:
1967-05-10
Operating Lic:
1974-06-28
Commercial Op:
1975-03-01
License Renewed:
2006-05-04
License Exp:
2034-06-28
Facility Map
34.7058, -87.1202