Ratings
Brunswick
- Above Average
- 18 (34%)
- Average
- 15 (28%)
- Below Average
- 19 (36%)
Facility Statistics
Lifecycle & Tenure
Operating Age: 49 Yrs
Build Time: 7.1 Yrs
Lic. Remaining: 10.5 Yrs
Production & Power
Lifetime CF: 90.6%
Efficiency: 32.1%
Generated: 202.4 TWh
Reliability & Outages
Record Run: 716 Days
Refuelings: 14
Ownership & Construction
Technical Specs
Reactor Type:
BWR
Containment:
BWR-MARK 1
NSS Supplier:
GE 4
Thermal Power:
2923 MWt
Net Capacity:
938 MWe
Efficiency:
32.1%
Status:
Operating
Licensing
Docket #:
05000325
License #:
DPR-71
License Type:
OL-FP
Const. Permit:
1970-02-07
Operating Lic:
1976-09-08
Commercial Op:
1977-03-18
License Renewed:
2006-06-26
License Exp:
2036-09-08
Facility Map
33.9585, -78.0102