Ratings
Brunswick
- Above Average
- 18 (34%)
- Average
- 15 (28%)
- Below Average
- 19 (36%)
Facility Statistics
Lifecycle & Tenure
Operating Age: 50.4 Yrs
Build Time: 5.7 Yrs
Lic. Remaining: 8.8 Yrs
Production & Power
Lifetime CF: 90.6%
Efficiency: 31.9%
Generated: 201.0 TWh
Reliability & Outages
Record Run: 726 Days
Refuelings: 14
Ownership & Construction
Technical Specs
Reactor Type:
BWR
Containment:
BWR-MARK 1
NSS Supplier:
GE 4
Thermal Power:
2923 MWt
Net Capacity:
932 MWe
Efficiency:
31.9%
Status:
Operating
Licensing
Docket #:
05000324
License #:
DPR-62
License Type:
OL-FP
Const. Permit:
1970-02-07
Operating Lic:
1974-12-27
Commercial Op:
1975-11-03
License Renewed:
2006-06-26
License Exp:
2034-12-27
Facility Map
33.9585, -78.0102