NukeWorker Menu

Hatch 1 - Plant Information & Status

Technical specifications, contact data, ratings, and licensing history for the Hatch facility.

Capacity Factor (365-Day)

100%
Current
84.3%
365-Day Avg
#87
of 94 plants
Min: 0% Max: 100% 63 days <80%

Ratings

Hatch
Above Average
17 (43%)
Average
12 (30%)
Below Average
10 (25%)
Total Members Voted: 21

Facility Statistics

Lifecycle & Tenure
Operating Age: 50.3 Yrs
Build Time: 6.3 Yrs
Lic. Remaining: 8.3 Yrs
Production & Power
Lifetime CF: 90.1%
Efficiency: 31.2%
Generated: 188.4 TWh
Reliability & Outages
Record Run: 706 Days
Refuelings: 14

Scram History 7 events since 2011

7
Total
2
Automatic
5
Manual
5.4
Avg Recovery (days)
Recent Events
2026-02-25 Manual MANUAL REACTOR SCRAM The following information was provided ...
2024-09-26 Manual MANUAL REACTOR TRIP ON LOWERING CONDENSER VACUUM The followi...
2024-03-10 Manual MANUAL REACTOR TRIP The following information was provided b...
2021-12-28 Manual EN Revision Imported Date: 1/28/2022 EN Revision Text: MANUA...
2021-08-02 Auto EN Revision Imported Date: 9/3/2021 EN Revision Text: AUTOMA...
2017-04-19 Auto AUTOMATIC REACTOR SCRAM DURING STARTUP "On 04/20/2017 at 030...
2013-02-09 Manual MANUAL REACTOR SCRAM INSERTED DUE TO DEGRADING REACTOR WATER...

Ownership & Construction

Owner/Operator: Southern Nuclear
Architect Engineer: BECH
Constructor: GPC

Technical Specs

Reactor Type: BWR
Containment: BWR-MARK 1
NSS Supplier: GE 4
Thermal Power: 2804 MWt
Net Capacity: 876 MWe
Efficiency: 31.2%
Status: Operating

Licensing

Docket #: 05000321
License #: DPR-57
License Type: OL-FP
Const. Permit: 1969-09-30
Operating Lic: 1974-10-13
Commercial Op: 1975-12-31
License Renewed: 2002-01-15
License Exp: 2034-08-06

Facility Map

31.9344, -82.3435

Location & Contact

Address:
11036 Hatch Parkway North US Hwy1
Baxley, GA 31513, USA
Get Directions
Phone: (912) 367-7781