NukeWorker Menu

Hatch 2 - Plant Information & Status

Technical specifications, contact data, ratings, and licensing history for the Hatch facility.

Capacity Factor (365-Day)

100%
Current
97%
365-Day Avg
#70
of 94 plants
Min: 0% Max: 100% 15 days <80%

Ratings

Hatch
Above Average
17 (43%)
Average
12 (30%)
Below Average
10 (25%)
Total Members Voted: 21

Facility Statistics

Lifecycle & Tenure
Operating Age: 46.6 Yrs
Build Time: 6.7 Yrs
Lic. Remaining: 12.2 Yrs
Production & Power
Lifetime CF: 90.8%
Efficiency: 31.5%
Generated: 191.4 TWh
Reliability & Outages
Record Run: 714 Days
Refuelings: 14

Scram History 5 events since 2011

5
Total
0
Automatic
5
Manual
5.4
Avg Recovery (days)
Recent Events
2025-09-12 Manual MANUAL REACTOR SCRAM The following information was provided ...
2023-10-31 Manual MANUAL REACTOR TRIP DUE TO TRIP OF REACTOR FEED PUMP The fol...
2023-03-30 Manual MANUAL REACTOR SCRAM AND AUTOMATIC ACTUATION OF CONTAINMENT ...
2019-03-23 Manual MANUAL REACTOR SCRAM DUE TO DEGRADING CONDENSER VACUUM "At 0...
2011-10-23 Manual MANUAL REACTOR SCRAM DUE TO ERRATIC IRM INDICATIONS DURING S...

Ownership & Construction

Owner/Operator: Southern Nuclear
Architect Engineer: BECH
Constructor: GPC

Technical Specs

Reactor Type: BWR
Containment: BWR-MARK 1
NSS Supplier: GE 4
Thermal Power: 2804 MWt
Net Capacity: 883 MWe
Efficiency: 31.5%
Status: Operating

Licensing

Docket #: 05000366
License #: NPF-5
License Type: OL-FP
Const. Permit: 1972-12-27
Operating Lic: 1978-06-13
Commercial Op: 1979-09-05
License Renewed: 2002-01-15
License Exp: 2038-06-13

Facility Map

31.9344, -82.3435

Location & Contact

Address:
11036 Hatch Parkway North US Hwy1
Baxley, GA 31513, USA
Get Directions
Phone: (912) 367-7781