NukeWorker Menu

Indian Point 3 - Plant Information & Status

Technical specifications, contact data, ratings, and licensing history for the Indian Point facility.

Ratings

Indian Point 3
Above Average
12 (50%)
Average
8 (33%)
Below Average
4 (16%)
Total Members Voted: 15

Facility Statistics

Lifecycle & Tenure
Operating Age: 44.7 Yrs
Build Time: 7 Yrs
Lic. Remaining: N/A Yrs
Production & Power
Lifetime CF: 91%
Efficiency: 32.6%
Generated: 178.5 TWh
Reliability & Outages
Record Run: 1,648 Days
Refuelings: 12

Scram History 10 events since 2011

10
Total
8
Automatic
2
Manual
2.3
Avg Recovery (days)
Recent Events
2018-09-17 Manual MANUAL REACTOR TRIP DUE TO A STEAM LEAK ON A HIGH PRESSURE F...
2018-02-15 Auto AUTOMATIC TRIP DUE TO LOSS OF EXCITATION ON MAIN GENERATOR "...
2017-11-02 Auto INDIAN POINT UNIT 3 REACTOR TRIP ON LOW STEAM GENERATOR LEVE...
2015-12-13 Auto AUTOMATIC REACTOR TRIP DUE TO MAIN GENERATOR LOCKOUT "At 190...
2015-07-07 Manual MANUAL REACTOR TRIP DUE TO LOWERING STEAM GENERATOR WATER LE...
2015-06-14 Auto REACTOR TRIP DUE TO TURBINE TRIP "On June 15, 2015 at 1920 E...
2015-05-08 Auto UNUSUAL EVENT DECLARED DUE TO MAIN TRANSFORMER FIRE "At 1750...
2014-08-12 Auto AUTOMATIC REACTOR TRIP "On August 13, 2014 at 1157 EDT, the ...
+2 more events

Ownership & Construction

Owner/Operator: Holtec International
Architect Engineer: UE&C
Constructor: WDCO

Technical Specs

Reactor Type: PWR
Containment: PWR-DRYAMB
NSS Supplier: WEST 4LP
Thermal Power: 3025 MWt
Net Capacity: 985 MWe
Efficiency: 32.6%

Licensing

Docket #: 05000286
License #: DPR-64
License Type: OL-FP
Const. Permit: 1969-08-13
Operating Lic: 1976-04-05
Commercial Op: 1976-08-30
License Renewed: N/A
License Exp: 2015-12-15

Facility Map

41.2691, -73.9527

Location & Contact

Address:
Broadway & Bleakley Ave
Buchanan, NY 10511, USA
Get Directions
Phone: (914) 736-8000