NukeWorker Menu

Perry 1 - Plant Information & Status

Technical specifications, contact data, ratings, and licensing history for the Perry facility.

Capacity Factor (365-Day)

100%
Current
93.8%
365-Day Avg
#48
of 94 plants
Min: 0% Max: 100% 20 days <80%

Ratings

Perry
Above Average
4 (6%)
Average
16 (27%)
Below Average
39 (66%)
Total Members Voted: 19

Facility Statistics

Lifecycle & Tenure
Operating Age: 38.4 Yrs
Build Time: 10.5 Yrs
Lic. Remaining: 20.6 Yrs
Production & Power
Lifetime CF: 87.1%
Efficiency: 33%
Generated: 257.8 TWh
Reliability & Outages
Record Run: 745 Days
Refuelings: 14

Scram History 10 events since 2011

10
Total
8
Automatic
2
Manual
10.1
Avg Recovery (days)
Recent Events
2023-08-09 Auto AUTOMATIC REACTOR TRIP The following information was provide...
2023-01-04 Auto AUTOMATIC REACTOR SCRAM The following information was provid...
2019-07-26 Auto AUTOMATIC REACTOR SCRAM DUE TO MAIN TURBINE TRIP "At 1929 ED...
2019-02-24 Auto AUTOMATIC REACTOR SCRAM DUE TO GENERATOR TRIP "At 0024 EST o...
2016-02-07 Manual MANUAL REACTOR SCRAM FOLLOWING SPURIOUS OPENING OF TWO SAFET...
2016-01-23 Auto TS REQUIRED SHUTDOWN DUE TO UNIDENTIFIED LEAKAGE IN DRYWELL ...
2014-11-06 Auto AUTOMATIC REACTOR SCRAM DUE TO LOSS OF FEEDWATER "The Perry ...
2014-10-19 Auto AUTOMATIC REACTOR SCRAM ON LOSS OF FEEDWATER "The Perry Powe...
+2 more events

Ownership & Construction

Owner/Operator: Vistra Corp.
Architect Engineer: GIL
Constructor: KAIS

Technical Specs

Reactor Type: BWR
Containment: BWR-MARK 3
NSS Supplier: GE 6
Thermal Power: 3758 MWt
Net Capacity: 1240 MWe
Efficiency: 33%
Status: Operating

Licensing

Docket #: 05000440
License #: NPF-58
License Type: OL-FP
Const. Permit: 1977-05-03
Operating Lic: 1986-11-13
Commercial Op: 1987-11-18
License Renewed: N/A
License Exp: 2046-11-07

Facility Map

41.8005, -81.1436

Location & Contact

Address:
10 North Center Road
Perry, OH 44081, USA
Get Directions
Phone: (216) 259-3737