NukeWorker Menu

Prairie Island 1 - Plant Information & Status

Technical specifications, contact data, ratings, and licensing history for the Prairie Island facility.

Capacity Factor (365-Day)

100%
Current
97.2%
365-Day Avg
#54
of 94 plants
Min: 0% Max: 100% 12 days <80%

Ratings

Prarie Island
Above Average
16 (38%)
Average
10 (23%)
Below Average
16 (38%)
Total Members Voted: 9

Facility Statistics

Lifecycle & Tenure
Operating Age: 52.3 Yrs
Build Time: 5.5 Yrs
Lic. Remaining: 7.3 Yrs
Production & Power
Lifetime CF: 88.6%
Efficiency: 31.1%
Generated: 110.2 TWh
Reliability & Outages
Record Run: 732 Days
Refuelings: 15

Scram History 5 events since 2011

5
Total
3
Automatic
2
Manual
1
Avg Recovery (days)
Recent Events
2025-07-15 Auto AUTOMATIC REACTOR TRIP The following information was provide...
2023-10-18 Auto AUTOMATIC REACTOR TRIP The following information was provide...
2020-08-25 Auto AUTOMATIC REACTOR TRIP DUE TO FLUX RATE "At 1319 CDT, on Aug...
2015-05-30 Manual MANUAL REACTOR TRIP DUE TO TRIP OF CONDENSATE AND MAIN FEEDW...
2011-06-30 Manual UNIT 1 MANUAL TRIP DUE TO ELECTRO-HYDRAULIC CONTROL FLUID LE...

Ownership & Construction

Owner/Operator: Xcel Energy
Architect Engineer: FLUR
Constructor: NSP

Technical Specs

Reactor Type: PWR
Containment: PWR-DRYAMB
NSS Supplier: WEST 2LP
Thermal Power: 1677 MWt
Net Capacity: 521 MWe
Efficiency: 31.1%
Status: Operating

Licensing

Docket #: 05000282
License #: DPR-42
License Type: OL-FP
Const. Permit: 1968-06-25
Operating Lic: 1974-04-05
Commercial Op: 1973-12-16
License Renewed: 2011-06-27
License Exp: 2033-08-09

Facility Map

44.622, -92.6331

Location & Contact

Address:
1717 Wakonade Drive East
Welch, MN 55089, USA
Get Directions
Phone: (612) 388-1121