NukeWorker Menu

Quad Cities 2 - Plant Information & Status

Technical specifications, contact data, ratings, and licensing history for the Quad Cities facility.

Capacity Factor (365-Day)

0%
Current
97.2%
365-Day Avg
#63
of 94 plants
Min: 0% Max: 100% 8 days <80%

Ratings

Quad Cities
Above Average
11 (28%)
Average
7 (18%)
Below Average
20 (52%)
Total Members Voted: 10

Facility Statistics

Lifecycle & Tenure
Operating Age: 53.1 Yrs
Build Time: 6.1 Yrs
Lic. Remaining: 6.7 Yrs
Production & Power
Lifetime CF: 92.3%
Efficiency: 30.8%
Generated: 200.7 TWh
Reliability & Outages
Record Run: 733 Days
Refuelings: 13

Scram History 6 events since 2011

6
Total
3
Automatic
3
Manual
8.7
Avg Recovery (days)
Recent Events
2024-05-22 Auto AUTOMATIC SCRAM DUE TO TURBINE TRIP SIGNAL The following inf...
2023-08-10 Auto AUTOMATIC REACTOR SCRAM The following information was provid...
2022-11-03 Manual MANUAL SCRAM DUE TO RISING WATER LEVEL The following informa...
2022-07-03 Manual REACTOR MANUAL SCRAM DUE TO LOWERING REACTOR WATER LEVEL The...
2014-04-01 Manual ALERT DECLARED DUE TO FIRE IN UNIT 2 TURBINE BUILDING "Quad ...
2012-04-17 Auto UNIT TWO AUTOMATIC REACTOR SCRAM ON HIGH REACTOR PRESSURE "O...

Ownership & Construction

Owner/Operator: Constellation Energy
Architect Engineer: S&L
Constructor: UE&C

Technical Specs

Reactor Type: BWR
Containment: BWR-MARK 1
NSS Supplier: GE 3
Thermal Power: 2957 MWt
Net Capacity: 911 MWe
Efficiency: 30.8%
Status: Operating

Licensing

Docket #: 05000265
License #: DPR-30
License Type: OL-FP
Const. Permit: 1967-02-15
Operating Lic: 1972-12-14
Commercial Op: 1973-03-10
License Renewed: 2004-10-28
License Exp: 2032-12-14

Facility Map

41.7255, -90.3089

Location & Contact

Address:
22710 206th Avenue North
Cordova, IL 61242, USA
Get Directions
Phone: (309) 227-2000