Ratings
Shearon Harris
- Above Average
- 15 (48%)
- Average
- 9 (29%)
- Below Average
- 7 (22%)
Facility Statistics
Lifecycle & Tenure
Operating Age: 38.9 Yrs
Build Time: 9.3 Yrs
Lic. Remaining: 20.6 Yrs
Production & Power
Lifetime CF: 91.5%
Efficiency: 32.7%
Generated: 210.0 TWh
Reliability & Outages
Record Run: 544 Days
Refuelings: 18
Ownership & Construction
Technical Specs
Reactor Type:
PWR
Containment:
PWR-DRYAMB
NSS Supplier:
WEST 3LP
Thermal Power:
2948 MWt
Net Capacity:
964 MWe
Efficiency:
32.7%
Status:
Operating
Licensing
Docket #:
05000400
License #:
NPF-63
License Type:
OL-FP
Const. Permit:
1978-01-27
Operating Lic:
1986-10-24
Commercial Op:
1987-05-02
License Renewed:
2008-12-17
License Exp:
2046-10-24
Facility Map
35.6329, -78.9559