NukeWorker Menu

Waterford 3 - Plant Information & Status

Technical specifications, contact data, ratings, and licensing history for the Waterford facility.

Capacity Factor (365-Day)

94%
Current
81.7%
365-Day Avg
#93
of 94 plants
Min: 0% Max: 99% 48 days <80%

Ratings

Waterford
Above Average
11 (31%)
Average
13 (37%)
Below Average
11 (31%)
Total Members Voted: 15

Facility Statistics

Lifecycle & Tenure
Operating Age: 40.5 Yrs
Build Time: 10.9 Yrs
Lic. Remaining: 18.7 Yrs
Production & Power
Lifetime CF: 86.9%
Efficiency: 31.4%
Generated: 241.8 TWh
Reliability & Outages
Record Run: 583 Days
Refuelings: 18

Scram History 10 events since 2011

10
Total
8
Automatic
2
Manual
2.6
Avg Recovery (days)
Recent Events
2024-06-15 Auto AUTOMATIC REACTOR TRIP The following information was provide...
2024-03-20 Auto EN Revision Imported Date: 3/28/2024 EN Revision Text: NOTIF...
2024-03-15 Manual MANUAL REACTOR TRIP DUE TO MAIN FEEDWATER AND MAIN STEAM ISO...
2022-06-23 Auto EN Revision Imported Date: 6/27/2022 EN Revision Text: AUTOM...
2020-11-01 Auto AUTOMATIC REACTOR TRIP DUE TO CONTROL ELEMENT DRIVE MECHANIS...
2019-05-15 Auto AUTOMATIC REACTOR TRIP DUE TO TURBINE TRIP "This is a non-em...
2017-07-16 Auto UNUSUAL EVENT DECLARED DUE TO LOSS OF OFFSITE POWER During a...
2015-10-02 Auto AUTOMATIC REACTOR TRIP "At 2307 CDT Waterford 3 experienced ...
+2 more events

Ownership & Construction

Owner/Operator: Entergy
Architect Engineer: EBSO
Constructor: EBSO

Technical Specs

Reactor Type: PWR
Containment: PWR-DRYAMB
NSS Supplier: COMB CE
Thermal Power: 3716 MWt
Net Capacity: 1165 MWe
Efficiency: 31.4%
Status: Operating

Licensing

Docket #: 05000382
License #: NPF-38
License Type: OL-FP
Const. Permit: 1974-11-14
Operating Lic: 1985-03-16
Commercial Op: 1985-09-24
License Renewed: 2018-12-27
License Exp: 2044-12-18

Facility Map

29.9874, -90.4449

Location & Contact

Address:
17265 River Road
Kilona, LA 70057, USA
Get Directions
Phone: (504) 464-3100