Ratings
Waterford
- Above Average
- 11 (31%)
- Average
- 13 (37%)
- Below Average
- 11 (31%)
Facility Statistics
Lifecycle & Tenure
Operating Age: 40.5 Yrs
Build Time: 10.9 Yrs
Lic. Remaining: 18.8 Yrs
Production & Power
Lifetime CF: 86.9%
Efficiency: 31.4%
Generated: 241.2 TWh
Reliability & Outages
Record Run: 583 Days
Refuelings: 18
Ownership & Construction
Technical Specs
Reactor Type:
PWR
Containment:
PWR-DRYAMB
NSS Supplier:
COMB CE
Thermal Power:
3716 MWt
Net Capacity:
1165 MWe
Efficiency:
31.4%
Status:
Operating
Licensing
Docket #:
05000382
License #:
NPF-38
License Type:
OL-FP
Const. Permit:
1974-11-14
Operating Lic:
1985-03-16
Commercial Op:
1985-09-24
License Renewed:
2018-12-27
License Exp:
2044-12-18
Facility Map
29.9874, -90.4449