NukeWorker Menu

Browns Ferry 3 - Plant Information & Status

Technical specifications, contact data, ratings, and licensing history for the Browns Ferry facility.

Capacity Factor (365-Day)

100%
Current
88%
365-Day Avg
#60
of 94 plants
Min: 0% Max: 100% 48 days <80%

Ratings

Browns Ferry
Above Average
20 (33%)
Average
15 (25%)
Below Average
24 (40%)
Total Members Voted: 25

Facility Statistics

Lifecycle & Tenure
Operating Age: 49.1 Yrs
Build Time: 8.6 Yrs
Lic. Remaining: 30.2 Yrs
Production & Power
Lifetime CF: 90.3%
Efficiency: 31.9%
Generated: 271.6 TWh
Reliability & Outages
Record Run: 730 Days
Refuelings: 14

Scram History 11 events since 2011

11
Total
9
Automatic
2
Manual
9.1
Avg Recovery (days)
Recent Events
2025-02-07 Auto EN Revision Imported Date: 2/14/2025 EN Revision Text: NOTIF...
2019-03-08 Auto AUTOMATIC SCRAM RESULTING IN RPS AND ECCS ACTUATION "At 2259...
2018-01-09 Auto AUTOMATIC REACTOR SCRAM DUE TO TURBINE CONTROL VALVE FAST CL...
2014-05-05 Auto AUTOMATIC REACTOR SCRAM DUE TO LOW REACTOR WATER LEVEL DURIN...
2014-03-17 Manual REACTOR SCRAM DUE TO FAILURE TO CONTROL MAIN TURBINE MOISTUR...
2013-02-24 Auto AUTOMATIC SCRAM DUE TO A TURBINE TRIP FROM A LOSS OF CONDENS...
2012-05-28 Auto AUTOMATIC REACTOR SCRAM DUE TO MAIN GENERATOR LOAD REJECT SI...
2012-05-23 Manual REACTOR SCRAM DURING STARTUP "At 0639 CDT on 5/24/2012. Unit...
+3 more events

Ownership & Construction

Architect Engineer: TVA
Constructor: TVA

Technical Specs

Reactor Type: BWR
Containment: BWR-MARK 1
NSS Supplier: GE
Thermal Power: 3952 MWt
Net Capacity: 1260 MWe
Efficiency: 31.9%
Status: Operating

Licensing

Docket #: 05000296
License #: DPR-68
License Type: OL-FP
Const. Permit: 1968-07-31
Operating Lic: 1976-07-02
Commercial Op: 1977-03-01
License Renewed: 2006-05-04
License Exp: 2056-07-02

Facility Map

34.7058, -87.1202

Location & Contact

Address:
Browns Ferry Nuclear Plant Road
Athens, Al 35611, USA
Get Directions
Phone: (265) 729-2000